Third Notice | | 12/1/2019 | 12/30/2019 | | DONE |
|
|
|
This permit finaled on the web by Ronald Van Auker
|
Third Notice | | 11/3/2019 | 11/26/2019 | | DONE |
|
|
|
mailed 12-2-19
|
Third Notice | | 9/25/2019 | 10/29/2019 | | DONE |
|
|
|
mailed 11-1
|
Second Notice | | 8/15/2019 | 9/20/2019 | | DONE |
|
|
|
mailed 9-23-19
|
First Notice | | 7/27/2019 | 8/5/2019 | | DONE |
|
|
|
mailed 8-5-23-2019
|
FIRE-Final Inspection | 7/17/2019 | 7/18/2019 | 7/17/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alam inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Ravenswood Solutions TI
|
Permanent Occupancy | | | 7/17/2019 | | DONE |
|
|
|
|
BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | NR |
Jim Storey
|
|
|
Mark Phone #: ###-####
|
FIRE-Final Inspection | 7/8/2019 | 7/11/2019 | 7/11/2019 | A | CANC |
Jim Page
|
|
|
Fire alarm inspection was cancelled due to wiring issues, point of contact for life fire safety notified me about issue and cancelled this inspection request, life fire safety inspection will be rescheduled for a later date to coincide with fire alarms after wiring issue is corrected.
Ron Phone #: ###-####-please call when on way so he can meet you there
|
BLD-Ceiling Grid Inspection | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-#### ceilling ok to cover.
|
BLD-Ceiling Grid Inspection | 6/21/2019 | 6/24/2019 | 6/24/2019 | A | PART |
Jim Storey
|
|
|
Ron Phone #: ###-#### east big rm needs primtor wires/ all other areas ok to coner.
|
BLD-Energy code compliance | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-#### 12 inch push at exit door south/east.
|
BLD-Framing/Rough-in | 4/25/2019 | 4/29/2019 | 4/29/2019 | A | PART |
Jim Sly
|
|
|
Mark Phone #: ###-#### Framing is complete and appears OK.....except asked them to add more bracing to top of walls. Mark wants to one side walls where Electrical has approved rough-in. Plumbing seems to be OK with that..........
|
BLD-Framing/Rough-in | 4/10/2019 | 4/11/2019 | 4/11/2019 | A | PART |
Jim Storey
|
|
|
Mark Phone #: ###-#### wip
|
Print Occupancy Form | | | 4/5/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/5/2019 | | DONE |
|
|
|
|
Routing - FIRE | 3/28/2019 | 3/28/2019 | 4/2/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Final review 04.02.2019.pdf uploaded.
|
Plan assigned to (JHB) | 2/26/2019 | 2/26/2019 | 4/2/2019 | | PASS |
Joe Bruce
|
|
|
04/03 (3rd Resub) (L2) Ravenswood Solutions, ePlan (Bldg, DR, Struc, Mech, Plumbing, PW)
|
Routing - PLAN CHECK | 3/28/2019 | | 4/2/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/2/2019 | | DONE |
|
|
|
4/4/19 emailed gjensen@vanauker.com the fees due CAN
met-NEED
GC FORM-met
REVISED VALUE-met
MET
ACHD
|
Routing - MECHANICAL | 3/28/2019 | | 3/29/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Street Lights | 3/28/2019 | | 3/28/2019 | | PASS |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 3/28/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - Design Review | 3/28/2019 | | 3/28/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 3/8/2019 | 3/8/2019 | 3/19/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 1st review 03.19.2019.pdf uploaded. Emailed applicant.
|
Routing - PLAN CHECK | 3/8/2019 | | 3/15/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing PW Sewer Design | 3/8/2019 | | 3/13/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Solid Waste | 3/8/2019 | | 3/11/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 3/8/2019 | | 3/11/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - MECHANICAL | 3/8/2019 | | 3/11/2019 | | FAIL |
Troy James
|
|
|
See eplan
|
Routing - Addressing | 3/8/2019 | | 3/11/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLUMBING | 3/8/2019 | | 3/8/2019 | | PASS |
Daryl Spivey
|
|
|
Install ASSE 1070 approved temp. limit on lavs as required by 407.3 ISPC.
|
Routing PW Street Lights | 3/8/2019 | | 3/8/2019 | | FAIL |
Tom Marshall
|
|
|
Need to add street lights to project at each driveway entrance facing Gowen Rd.
|
Routing PW Environmental | 3/8/2019 | | 3/8/2019 | | PASS |
Terry Alber
|
|
|
No pretreatment needed at this time.
|
Routing - Design Review | 3/8/2019 | | 3/8/2019 | | FAIL |
Andrea Tuning
|
|
|
This proposal required Design Review approval.
|
Routing - PUBLIC WORKS | 3/8/2019 | | 3/8/2019 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 3/1/2019 | 3/4/2019 | 3/5/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 2/26/2019 | | 3/1/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan Reviewer's activity | | | 3/1/2019 | | DONE |
Joe Bruce
|
|
|
Spoke with Gayle Jensen about additional items needed for a complete plan review. (Zoning certificate for mech units, fence, and new exterior window) - Also need structural calculations and details for mechanical rooftop units. **JHB**
|
1st review completed | | | 3/1/2019 | | FAIL |
Joe Bruce
|
|
|
|
Intake Approval | | | 2/26/2019 | | PASS |
Michael Hanson
|
|
|
Prescreen approved by Michael Hanson.
|
Application received | | | 2/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 20 2019 2:10PM
|