Permit Information
Permit NumberBLD19-00514
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5992 E BARBER DR
Project NameHarris North #1
Customer Number 
ePlanReviewYes
Description
***Prescriptive component energy approach***WUI Zone A requirements*** Permit for the construction of a new 3807 sq. ft., two story (first story 2512 sq. ft., second story 1295 sq. ft.) single family dwelling with 4 bedrooms, 4.5 bathrooms, approximately 587 sq. ft. of covered patio/porch and a 730 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. MDH SPRINKLERS ARE REQUIRED. LGM
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/25/201910/28/201910/28/2019APASS
DetailsDave Hannah
Les Phone #: ###-####
DOC - Permit Finaled10/28/201910/28/201910/28/2019PPASS
DetailsDave Hannah
PubWorks Occupancy Approval10/17/201910/17/201910/17/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Energy code compliance7/1/20197/2/20197/2/2019APASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Framing/Rough-in6/25/20196/26/20196/26/2019APASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in6/21/20196/21/20196/21/2019PFAIL
DetailsJim Storey
Wes Phone #: ###-#### c/n posted/joist to girder hangers not nailled no support/ mlb hangers not nailed/ s1.1 vertical supports not per plan// bg1 truss missing 1/4 sds screws.
BLD-Other6/10/20196/11/20196/11/2019ACANC
DetailsBrandon Shaw
sofits-les Phone #: ###-####
BLD-Other6/10/20196/10/20196/10/2019PPASS
DetailsBrandon Shaw
Soffit- OK to cover...
BLD-Wall Bracing5/21/20195/21/20195/21/2019PPASS
DetailsBrandon Shaw
Less Phone #: ###-####
BLD-Foundation4/24/20194/24/20194/24/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing4/23/20194/23/20194/23/2019APASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval4/23/20194/23/20194/23/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  4/12/2019  
Issue PAID IN FULL permit  4/12/2019 DONE
Inspection Record Card- Bld  4/12/2019 DONE
Permit Ready to Issue  4/12/2019 DONE
OVERRIDE  3/7/2019  
1st review completed  3/7/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  3/7/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  3/7/2019 DONE
met
Plan assigned to (M_H)2/25/2019 3/7/2019 DONE
DetailsMichael Hanson
03/14 #404 L2 ePlan
Routing - PLAN CHECK2/25/2019 3/7/2019 PASS
DetailsMichael Hanson
Routing - PLANNING2/25/2019 3/7/2019 PASS
DetailsSue Cummings
Routing PW Grading-Hillside2/25/2019 2/28/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Route to Impact Fee Review2/25/20192/28/20192/26/2019 PASS
DetailsKarina Myles
Initial residential review of new SFD permits requested for now.
Routing - FIRE2/25/20192/25/20192/25/2019 PASS
DetailsLee G Meredith
NFPA 13D fire sprinkler system is being provided by builder, as noted on the drawings.
Routing - MECHANICAL2/25/2019 2/25/2019 PASS
DetailsChad Schwendiman
Routing - Addressing2/25/2019 2/25/2019 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/25/2019 2/25/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment2/25/2019 2/25/2019 PASS
DetailsMichael Zawacki
Plans ACCEPTED BY PLAN TECH  2/25/2019 DONE
Recd Pcfee & Taken To Pln CK  2/25/2019 DONE
Intake Approval  2/25/2019 PASS
Intake Approval  2/21/2019 FAIL
Please provide WUI requirement detail.
Please fix address on grading plan then resubmit. Let me know if you have any questions.
Application received  2/20/2019 DONE
Application submitted via PDS Online on Feb 20 2019 3:06PM