Permit Information
Permit NumberBLD19-00521
StatusFinaled
Name CONSTRUCTION SOLUTIONS COMPANY LLC
Site Address 8571 W FRANKLIN RD
Project NameMcDonald's #13630
Customer Number 
ePlanReviewYes
Description
(MCDONALD’S #13630) Permit is to remodel the interior and exterior of an existing 3,817 sq. ft. assembly restaurant. Approval is contingent upon adhering to the approved plans on file, plan review report and attached engineering. Work to include: removal of select site work, removal of select exterior walls, removal of outdoor play structure, removal of select exterior storefront doors, removal of select storefront windows, removal of select mansard roof assembly, removal of select exterior parapet, removal of select interior walls, removal of dining area seating/tables/counters, removal of restroom plumbing fixtures, select removal of select kitchen equipment, removal of interior customer service counter, removal of interior menu boards and relocate, removal of select floor finishes, removal of select soffit ceiling, relocate beverage bar counter, select new site work, new exterior site concrete sidewalk and concrete slab, select new site planter box retaining wall, select new footing for addition, new construction of exterior wall framing to create a total of 44 sq. ft. building addition to the existing building on the NW and SW front entry to the dining area , select new structural columns, select new exterior wall assembly, select new exterior metal canopies, select new exterior wall infill, select new exterior storefronts window and doors, select new exterior roof parapet wall, new exterior TPO roof, select new interior nonbearing walls, select new ceiling soffit, restroom remodel, new dining room fixture, millwork, select new kitchen equipment, select new suspended acoustic ceiling, select new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. Note: special inspection required, see attached form 310. Note 2: A separate sign permit is required. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  12/2/2019 DONE
Spoke with Skyler Dabell to check on the project value and mechanical value. The mechanical that was submitted was for demo work only, no MEC permit was required (see attahced MIS case). Project changed becuse the cost of work went down.
Second Notice 11/4/201911/25/2019 DONE
mailed 12-2-19
First Notice 10/13/201910/25/2019 DONE
mailed 11-1-19
Permanent Occupancy  10/3/2019 DONE
BLD-Final10/1/201910/2/201910/2/2019APASS
DetailsMike Jordan
Josh Phone #: ###-####. Ok for perm occ.
BLD-Final9/16/20199/18/20199/18/2019AFAIL
DetailsMike Jordan
Josh Phone #: ###-####. Provide the additional hand rail at north west exit. everything else ok.
FIRE-Final Inspection9/16/20199/17/20199/17/2019PPASS
DetailsMike Jordan
Josh Phone #: ###-####. All previously noted items have been repaired.
Zoning Approval9/17/20199/17/20199/17/2019 PASS
DetailsKayCee Babb
Per DRH19-00013, as revised 4-10-19.
FIRE-Final Inspection7/23/20197/23/20197/23/2019PCANC
DetailsTroy Cobbley
To be rescheduled per Josh-please call when on way so can meet with you Phone #: ###-####
FIRE-Final Inspection7/10/20197/10/20197/10/2019PFAIL
DetailsTroy Cobbley
No small documents on site. I noted that one exit discharge light did not function and the other was not installed yet. We discussed CO alarm and occupant load signage. Fire extinguisher and hood suppression inspections are current. Per the contractor there was no change of kitchen equipment or change of hvac equipment.

Josh- please call before arriving Phone #: ###-####
BLD-Ceiling Grid Inspection6/12/20196/12/20196/12/2019PPASS
DetailsMike Jordan
josh Phone #: ###-####
BLD-Ceiling Grid Inspection6/3/20196/4/20196/4/2019ANR
DetailsMike Jordan
Josh Phone #: ###-####. Needs mep's and finish install.
BLD-Wall Bracing5/28/20195/28/20195/28/2019PPASS
DetailsMike Jordan
shear // Josh Phone #: ###-####
BLD-Footing5/20/20195/20/20195/20/2019PPART
DetailsMike Jordan
Josh Phone #: ###-####. Contractor has gotten special inspection on adhesive anchors, will have conrete tested as well. Work in progress on installing remaining reinforcement Ok for concrete.
BLD-Footing5/16/20195/17/20195/17/2019ANR
DetailsMike Jordan
josh Phone #: ###-####. Special inspection is required for the adhesive anchors. Work is still inprogress.
BLD-Framing/Rough-in5/14/20195/15/20195/15/2019APASS
DetailsMike Jordan
Josh-please call 30 minutes prior to meet Phone #: ###-####. New facade framing ok.
Print Occupancy Form  5/1/2019 DONE
Issue PAID IN FULL permit  5/1/2019 DONE
OVERRIDE  4/17/2019  
Plan assigned to (JG)4/11/20194/11/20194/17/2019 PASS
DetailsJavier Guzman
2nd rev, McDonald's #13630
Routing - PLAN CHECK4/12/2019 4/17/2019 PASS
DetailsJavier Guzman
Permit Ready to Issue  4/17/2019 DONE
Need_all met
GC Form-met
RP
Revised Value-met
Routing - Design Review4/12/2019 4/16/2019 PASS
DetailsKayCee Babb
Per DRH19-00013, select changes to the exterior are approved as shown on sheets A1.0, A2.0, A4.0, A4,1, A7.1. All conditions of approval, including color selection, shall be met.
Plan resubmittals received  4/11/2019 DONE
Resubmittal received in e plan-changes to the outside of the building decor
OVERRIDE  4/2/2019  
Route to Impact Fee Review4/2/20194/5/20194/2/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Plan assigned to (JG)3/9/20193/9/20194/2/2019 PASS
DetailsJavier Guzman
03/27 L3 McDonalds ePlan, pend fire and eng
Routing Off Site - STRUCTURAL3/21/2019 4/2/2019 PASS
DetailsJavier Guzman
Signed off in ePlan by KPFF Sidney Gold
1st review completed  4/2/2019 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  4/2/2019 DONE
Permit Ready to Issue  4/2/2019 DONE
NEED-
GC form
Revised Cert of Value
RP-met
Routing - FIRE3/9/20193/9/20194/1/2019 PASS
DetailsMark Scharfen
IFC Review 04.01.2019.pdf uploaded.
Routing - PLAN CHECK3/9/2019 3/28/2019 PASS
DetailsJavier Guzman
Routing PW Environmental3/11/2019 3/18/2019 PASS
DetailsRick Christenson
Routing - Design Review3/9/2019 3/12/2019 PASS
DetailsKayCee Babb
Per DRH19-00013. All conditions of approval, including color selection, shall be met.
Routing - MECHANICAL3/9/2019 3/11/2019 PASS
DetailsTroy James
No mechanical work shown.
Routing - PLUMBING3/9/2019 3/11/2019 PASS
DetailsDaryl Spivey
See redline notes and per plan and ISPC.
Routing - Addressing3/9/2019 3/11/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/9/2019 3/11/2019 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment3/9/2019 3/11/2019 PASS
DetailsMichael Zawacki
Follow provided ESC map and plan
Intake Approval  3/6/2019 PASS
Intake Approval  2/28/2019 FAIL
DetailsBrian McGowan
Please provide the following information in order to process the Prescreen;
1. Provide Planning and Zoning Approval Letters.
2. Complete the cover sheet of Form #310.
3. DOC_McDonalds.ESC is not signed and stamped.
4. The exterior Menu Board designs were uploaded twice. These will need to be applied for in a separate permit. (The exterior Menu Board design is stamped and signed by a Tennessee Engineer. The stamp needs to be an Idaho Stamp.)
5. Sheets DT1.1, DT1.2, DT1.3 are not stamped by an Engineer.
6. DOC_Persona DT Sign Calcs are for Mountain Home, not Boise.
7. DOC_Persona DT Sign Dwgs is for Mountain Home.
8. DWG_Coates ODMB- 115 MPH has a Tennessee stamp and 2012 IBC. It is for a sign and should be submitted for in a separate permit.
9. No Sheet A10.0 was uploaded for the finish schedule or required plumbing fixtures. It is referenced to for Accessibility as well.
10. A1.1 does not show Exit signs and Emergency lighting.
11. DOC_McDonalds.ESC.Narrative has the wrong address on the cover sheet and is not stamped and signed.
12. The documents and drawings for the signs and foundations/footings for the signs must be applied for in a separate permit and pass Planning.
Note that many of the sheets specified as to where to find the information was not correct. Please verify that the Sheet number matches where the information can be found.
Than you,
Application received  2/21/2019 DONE
Application submitted via PDS Online on Feb 21 2019 1:41PM