Permit Information
Permit NumberBLD19-00539
StatusUnder Review
Name ESI
Site Address 11948 W FAIRVIEW AVE
Project NameVillage East - Maint. & Garage
Customer NumberBLD19-00526-00536, 538-539
ePlanReviewNo
Description
(13 PERMITS IN EPLAN UNDER BLD19-00526) (MAINTENANCE AND GARAGE BUILDING – VILLAGE EAST APARTMENTS) (PUD18-00042) (DRH18-00528) The “Maintenance and Garage Building” does not have a fire sprinkler system. To construct a storage and garage building having a total floor area of about 3,270 square feet. Work is to include concrete footings, concrete stem walls, concrete slab on grade, wood stud exterior walls, structural wood panel shear walls with hold downs, engineered wood trusses, structural wood panel roof deck and diaphragm, three interior 1-hr fire barrier walls, overhead doors, a side-hinged swinging exit door, window, composite shingles, and fiber cement horizontal lap siding. The truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the structural designs, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Routing - Design Review8/11/2020 8/11/2020 PASS
DetailsKatelyn Menuge
BLD-Aging Inspection6/30/20206/30/20206/30/2020 CANC
DetailsTell Riley
BLD-Aging Inspection6/29/20206/29/20206/30/2020 PASS
DetailsTell Riley
wip
Issue PAID IN FULL permit  8/15/2019 DONE
Print Occupancy Form  8/15/2019 DONE
Permit Ready to Issue  8/13/2019 DONE
DO NOT ISSUE WITHOUT OHTER 13 PERMITS AND VOIDED PERMIT HAS PLAN CHECK FEES
met
RP
GC
Revised Certificate of Value
Routing PW Street Lights8/12/2019 8/12/2019 PASS
DetailsTom Marshall
Plan assigned to (CJW)3/11/20193/11/20198/10/2019 PASS
DetailsCarl Westfall
* (2nd done) 04/08/19 (new buildings - 25 days) (eplan) Village East Apartments (Maintenance and Garage Building) (approved pending structural)
Plan Reviewer's activity  8/10/2019 DONE
See the routing under permit BLD19-00526 for all buildings.
PLANS/APPL TAKEN TO FRONT DESK  8/10/2019 DONE
Routing - Design Review8/5/2019 8/5/2019 PASS
DetailsAndrea Tuning
Routing - FIRE7/9/20197/9/20197/16/2019 PASS
DetailsMark Scharfen
07/16-Village East maintenance building resubmittal. MS. Maintinance building added to garage. This permit may be going away. Building is approved. All permits ok on fire. rev_fire 07.16.2019.pdf uploaded.
Routing PW Drainage7/15/2019 7/15/2019 PASS
DetailsBrian Murphy
Plan resubmittals received  7/8/2019 DONE
See the routing under permit BLD19-00526 for the 3rd plan review. None of the permits can be issued until all plan reviews are approved. CJW
Routing - FIRE6/13/20196/13/20196/24/2019 FAIL
DetailsMark Scharfen
06/26-Village East Maintinance building resbumittal MS. Need HMIS. rev_fire 06.24.2019.pdf uploaded and emailed to architect.
Routing - Design Review6/17/2019 6/17/2019 FAIL
DetailsAndrea Tuning
A total of 272 bicycle parking spaces will be required. A minimum of 68 of the bicycle parking spaces are required to be covered. To provide a safe, covered and efficient location for the bicycles, design the spaces to be a minimum of 6-feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground. A detail of the rack and how it is attached to the wall should be submitted with the building permit.

Vertical curbing shall be utilized adjacent to all landscaping and pedestrian walk ways. Permanent wheel restraints may be utilized in lieu of curbing adjacent to pedestrian walk ways.

All interior and terminal planter islands shall provide at least one Class II tree within all of the interior and terminal planters.

Provide an easement for portions of the Valley Regional transit stop located on private property.

Continue to work with staff to provide a cohesive and quality exterior building design in regard to material breaks, the application of brick on each building and the color palette for the development. This may include providing a brick wainscot or brick corner elements on each building, reevaluating the location of material breaks and further refining the color palette.

Employ techniques to recess windows above the ground floor a minimum of 2-inches from the façade or incorporated window trim at least 4-inches in width. Submit a window detail showing this recess.
Plan Reviewer's activity  6/13/2019 DONE
See the routing under permit BLD19-00526 for the 2nd plan review. None of the permits can be issued until all plan reviews are approved. CJW
Route to Impact Fee Review5/15/20195/18/20195/15/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - PLAN CHECK3/11/2019 5/15/2019  
DetailsCarl Westfall
1st review completed  5/15/2019 DONE
Plan resubmittals requested  5/15/2019 DONE
Routing - Erosion and Sediment3/11/2019 4/25/2019 PASS
DetailsAndy J. Long
see ESC19-00181 for details
Routing - FIRE3/11/20193/11/20194/12/2019 FAIL
DetailsMark Scharfen
IFC 1st review 04.12.2019.pdf
Routing Off Site - STRUCTURAL3/11/2019 3/27/2019 FAIL
DetailsCarl Westfall
Cory Harelson (KPFF)
Routing PW Sewer Design3/12/2019 3/26/2019 PASS
DetailsDeAnn Brown
Routing PW Drainage3/12/2019 3/21/2019 FAIL
DetailsBrian Murphy
Routing PW Solid Waste3/12/2019 3/21/2019 PASS
DetailsEvan Carpenter
Routing - PLANNING3/11/2019 3/19/2019 FAIL
DetailsLeon Letson
Routing - MECHANICAL3/11/2019 3/15/2019 PASS
DetailsTroy James
Routing - Design Review3/11/2019 3/13/2019 FAIL
DetailsAndrea Tuning
Routing - Addressing3/11/2019 3/12/2019 PASS
DetailsDoug Chausow
Maintenace Bldg: 11948 W Fairview Ave
Routing - PUBLIC WORKS3/11/2019 3/12/2019 PASS
DetailsAngela Hardy
Routing PW Street Lights3/12/2019 3/12/2019 FAIL
DetailsTom Marshall
Routing - PLUMBING3/11/2019 3/11/2019 PASS
DetailsDaryl Spivey
Meet suds relief requirements and per ISPC.
Intake Approval  3/5/2019 PASS
Application received  2/21/2019 DONE
Application submitted via PDS Online on Feb 21 2019 5:02PM