Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-00546
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 12016 W STILLWATER DR
Project NameJames Grunow PV
Customer Number 
ePlanReviewYes
Description
MODIFICATION - CHANGED PANEL MANUFACTURER 5/23/19 **jab** Permit for 210sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 12 panels in 1 array. No work needed to the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/6/20196/7/20196/7/2019PPASS
DetailsJim Storey
Inspection requested via web by BRS Permitting
DOC - Permit Finaled6/7/20196/7/20196/7/2019PPASS
DetailsJim Storey
CHANGE STATUS TO (ISS)  5/29/2019 DONE
Plan assigned to (JAB) Josh5/17/20195/17/20195/23/2019 PASS
DetailsJosh Bogle
5/23 PV plan mod, ePlan - 1st done
Routing - PLAN CHECK5/22/2019 5/23/2019 FAIL
DetailsJosh Bogle
no cut sheet provide for new panel
Routing - PLAN CHECK5/23/2019 5/23/2019 PASS
DetailsJosh Bogle
no PC fee
Permit Ready to Issue  5/23/2019 DONE
plan mod permit desk fee-please do not re issue
BLD-Framing/Rough-in5/16/20195/17/20195/17/2019APASS
DetailsJim Sly
If possible, please call the number above before heading out to the jobsite. Thank you! Phone #: ###-#### Inspection requested via web by BRS Permitting
Plan Modification Accepted  5/17/2019 DONE
Changing the type of cell panels being used.
Issue PAID IN FULL permit  3/1/2019 DONE
Plan assigned to (JAB) Josh2/22/20192/22/20192/28/2019 PASS
DetailsJosh Bogle
2/28 PV, ePlan
Routing - PLAN CHECK2/22/2019 2/28/2019 PASS
DetailsJosh Bogle
1st review completed  2/28/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  2/28/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  2/28/2019 DONE
Application received  2/22/2019 DONE
Application submitted via PDS Online on Feb 22 2019 12:29PM
Plans ACCEPTED BY PLAN CHECK  2/22/2019 DONE
Intake Approval  2/22/2019 PASS
Recd Pcfee & Taken To Pln CK  2/22/2019 DONE
Routing - PLANNING2/22/2019 2/22/2019 PASS
DetailsSue Cummings