BLD-Wall Bracing | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PASS |
Jim Storey
|
|
|
fire wall // Jeff Phone #: ###-####
|
BLD-Wall Bracing | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Jim Storey
|
|
|
Jeff Phone #: ###-#### frame and firewall ok. to cover.
|
BLD-Wall Bracing | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | PART |
Mike Jordan
|
|
|
jEFF Phone #: ###-#### Exterior framing and roof ok, still needs to install diagnol wind girts. No one on site. No call back from contractor.
|
BLD-Footing | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Jim Storey
|
|
|
Jeff Phone #: ###-####
|
Telephone call | | | 6/27/2019 | | DONE |
|
|
|
email from Duane with address changes
|
OVERRIDE | | | 6/5/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/5/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/5/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/3/2019 | | DONE |
|
|
|
emailed Duane that we need the whole 306 for in order to issue the permit once the fees have been paid. He emailed the front page but not the 2nd with his signature
|
Telephone call | | | 5/30/2019 | | DONE |
|
|
|
emailed a reminder to Duane that we still need the rev cert of val with all the associated values on the sub permits as well-plans are at my desk CAN
|
OVERRIDE | | | 5/24/2019 | | |
|
|
|
|
Print Occupancy Form | | | 5/24/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/24/2019 | | DONE |
|
|
|
|
Telephone call | | | 5/24/2019 | | DONE |
|
|
|
called Duane to let know we still need the rev cert of val with all the associated values on it-the one he turned in originally just had the building values-left message
|
Routing Off Site - STRUCTURAL | 5/14/2019 | | 5/24/2019 | | PASS |
Michael Hanson
|
|
|
See documents for approval email from Cory @ KPFF.
|
Plan Reviewer's activity | | | 5/24/2019 | | DONE |
Michael Hanson
|
|
|
Emailed KPFF for status update
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2019 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 5/24/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 5/24/2019 | | DONE |
|
|
|
all met-RP-met
need cert of val with all sub fees included-called and left message with GC-met
|
Pending Assignment by CDM | 2/22/2019 | | 5/24/2019 | | PASS |
Carl D Madsen
|
|
|
|
Plan assigned to (M_H) | 2/27/2019 | | 5/24/2019 | | DONE |
Michael Hanson
|
|
|
2nd review completed - 04/04 #502 Paper - pending offsite structural review
|
Routing - PLAN CHECK | 5/15/2019 | | 5/16/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing - FIRE | 5/14/2019 | 5/14/2019 | 5/15/2019 | | PASS |
Mark Scharfen
|
|
|
05/15 Idaho Materials and Construction Pole Building MS Resubmittal. Uploaded rev_fire 05.15.2019.pdf. Passed review.
|
Routing - MECHANICAL | 5/14/2019 | | 5/15/2019 | | PASS |
Troy James
|
|
|
7 million btu water water with 4" 10# gas line to building. Gas line has been installed and not inspected by city of boise. Intermountain gas needs to take responsibility of the install or contractor is to provide test and remove dirt for inspection.
|
Plan resubmittals received | | | 5/8/2019 | | DONE |
|
|
|
Two copies of packet labeled houston bugatsch architects chartered, two copies of packet labeled response to review comments, two copies of fire hydrant letter, two copies of Structural cals, three copies of sheets G1.0, G2.0, A1.0, A1.1, S1 and M1.0. taken to michael
|
Route to Impact Fee Review | 4/4/2019 | 4/7/2019 | 4/5/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 2/27/2019 | 2/27/2019 | 4/4/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 1st Review 04.04.2019.pdf uploaded and emailed to applicant.
|
Routing Off Site - STRUCTURAL | 2/27/2019 | | 4/4/2019 | | FAIL |
Michael Hanson
|
|
|
See email for corrections from C. Harelson @ KPFF.
|
1st review completed | | | 4/4/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing - Erosion and Sediment | 4/3/2019 | | 4/3/2019 | | PASS |
Michael Zawacki
|
|
|
Waiver request approved.
|
Routing - Design Review | 4/3/2019 | | 4/3/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH19-00044.
|
Routing - PLAN CHECK | 2/27/2019 | | 4/3/2019 | | FAIL |
Michael Hanson
|
|
|
See emailed building plan review. MDH
|
Routing - PUBLIC WORKS | 2/27/2019 | | 3/12/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing PW Environmental | 3/6/2019 | | 3/12/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Solid Waste | 3/4/2019 | | 3/5/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Street Lights | 2/28/2019 | | 3/1/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 3/1/2019 | | 3/1/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Drainage | 2/28/2019 | | 2/28/2019 | | PASS |
Brian Murphy
|
|
|
less than 1000 sqft
|
Routing - Addressing | 2/27/2019 | | 2/27/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 2/22/2019 | | PASS |
Michael Hanson
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/22/2019 | | DONE |
|
|
|
|
Application received | | 2/22/2019 | | | |
|
|
|
|
Routing - MECHANICAL | 2/27/2019 | | | | FAIL |
Troy James
|
|
|
Plans are submitted with no mechanical design for the water heater. Need mechanical engineered stamped plans.
|