BLD-Final | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
DOC - Permit Finaled | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 4/10/2019 | 4/11/2019 | 4/11/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-#### Frame and Energy.....OK.
|
BLD-Framing/Rough-in | 4/5/2019 | 4/8/2019 | 4/8/2019 | P | NR |
Jim Sly
|
|
|
Bill (husband) Phone #: ###-#### Need Ele Rough in.
|
BLD-Foundation | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Jim Sly
|
|
|
Kathy Phone #: ###-#### Mono pour.....OK.
|
Routing Walk-In (BLD) | 3/5/2019 | 3/5/2019 | 3/5/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/5/2019 | | 3/5/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/5/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/5/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/5/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/5/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/5/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 2/27/2019 | 2/27/2019 | 2/27/2019 | A | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/27/2019 | | 2/27/2019 | | FAIL |
Brian McGowan
|
|
|
Had questions on how to final plans. Gave him notes on what to show and asked for a larger floor plan to scale.
|
Routing Walk-In (Zoning) | 2/25/2019 | 2/25/2019 | 2/25/2019 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 2/25/2019 | 2/25/2019 | 2/25/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/25/2019 | | 2/25/2019 | | FAIL |
Josh Bogle
|
|
|
needed more details
|
1st review completed | | | 2/25/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 2/25/2019 | | | |
|
|
|
|