First Follow up | | | 1/15/2020 | | DONE |
|
|
|
Final value received by mail 1-15-20
|
First Notice | | 12/29/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
DOC - Permit Finaled | | | 12/19/2019 | | DONE |
|
|
|
not for occupancy, final was completed 10/1/19
|
BLD-Final | 9/30/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Dave Hannah
|
|
|
Call half hour before // Brandon Phone #: ###-####
|
FIRE-Final Inspection | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete, signature provide on sign off card.
call for access- brandon Phone #: ###-####
|
BLD-Final | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | CANC |
Dave Hannah
|
|
|
Call ahead 30 minutes // Brandon Phone #: ###-####
|
BLD-Framing/Rough-in | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Dave Hannah
|
|
|
Call ahead 30 minutes // Brandon Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/18/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/18/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2019 | | DONE |
|
|
|
spoke with brandon informing him this permit is ready and the fee amount due
|
Routing Off Site - STRUCTURAL | 5/31/2019 | | 6/11/2019 | | PASS |
Michael Hanson
|
|
|
Passed per Jan W. @ Stapley. See documents...
|
Inspection Record Card- Bld | | | 6/11/2019 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 6/11/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2019 | | DONE |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 6/11/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/11/2019 | | DONE |
|
|
|
Met
|
Plan assigned to (M_H) | 2/27/2019 | | 6/11/2019 | | DONE |
Michael Hanson
|
|
|
3rd review completed - 03/22 #520 L3 Paper - Woodland Empire
|
Routing - PLAN CHECK | 5/16/2019 | | 6/11/2019 | | PASS |
Michael Hanson
|
|
|
|
Plan resubmittals received | | | 5/31/2019 | | DONE |
|
|
|
plans received from Steven
|
Routing Off Site - STRUCTURAL | 5/16/2019 | | 5/22/2019 | | FAIL |
Michael Hanson
|
|
|
See email from Jan @ Stapley
|
Routing - Design Review | 5/16/2019 | | 5/17/2019 | | PASS |
Andrea Tuning
|
|
|
Redlines were made to require the overhead door on the east elevation is required to be silver annodized aluminum and the overhead door on the north elevation on the north elevation is required to be painted to match the surrounding wall color.
|
Plan resubmittals received | | | 5/16/2019 | | DONE |
|
|
|
Three sets of each Title page, A-100 Site Plan, A-200 Floor Plan, A-300 Exterior Elevations, S-000 General Notes, S-001 Special Inspections, S-101 Foundation Plan, S-111 Framing Plan, S-201 Details, S-202 Details and Supplemental Calculation Package and the 310 form.
One new application and One new 304 form.
All stamped and taken to plan reviewer.
|
Route to Impact Fee Review | 3/22/2019 | 3/25/2019 | 3/25/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 2/27/2019 | 2/27/2019 | 3/22/2019 | | PASS |
Mark Scharfen
|
|
|
IFC review 03.22.2019.pdf uploaded.
|
1st review completed | | | 3/22/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing Off Site - STRUCTURAL | 2/27/2019 | | 3/21/2019 | | FAIL |
Michael Hanson
|
|
|
See documents for structural review by Jan W. @ Stapley engineering.
|
Routing - PLAN CHECK | 2/27/2019 | | 3/21/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing - Erosion and Sediment | 2/27/2019 | | 2/28/2019 | | PASS |
Michael Zawacki
|
|
|
TI, no esc needed
|
Routing - Design Review | 2/27/2019 | | 2/27/2019 | | FAIL |
Andrea Tuning
|
|
|
The building permit package does not contain elevations that show the materials of the overhead door. Elevations shoudl be included within the building permit package.
|
Plan Reviewer's activity | | | 2/27/2019 | | DONE |
Carl D Madsen
|
|
|
Contcted the contractor Brandon Boomgarden and the engineer Joseph Lane and requested a Site plan with property lines and alley as the door on the alley needs to be evaluated for distance to property lines (center of alley) for allowable openings.
|
Intake Approval | | | 2/25/2019 | | PASS |
Julie Romig
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/25/2019 | | DONE |
|
|
|
|
Application received | | 2/25/2019 | | | |
|
|
|
|