BLD-Final | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
Jim Storey
|
|
|
Gabriel Phone #: ###-####
|
DOC - Permit Finaled | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | NR |
Brandon Shaw
|
|
|
Need ELE final...
|
BLD-Framing/Rough-in | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PART |
Jim Storey
|
|
|
Gabriel Phone #: ###-#### bed rooms ok to cover pending plm in bathroom area.
|
BLD-Framing/Rough-in | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | NR |
Jim Storey
|
|
|
call for lock box code // Gabriel Phone #: ###-####
|
Routing Walk-In (BLD) | 2/27/2019 | 2/27/2019 | 2/27/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/27/2019 | | 2/27/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/27/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/27/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/27/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/27/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/27/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 2/26/2019 | 2/26/2019 | 2/26/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/26/2019 | | 2/26/2019 | | FAIL |
Josh Bogle
|
|
|
needs "before" floor plan, section, and pics of existing conditions
|
1st review completed | | | 2/26/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 2/26/2019 | | | |
|
|
|
|