Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-00590
StatusFinaled
Name THE CHRISTENSEN CORPORATION
Site Address 950 W BANNOCK ST Unit: 270
Project NameASG Suite 270
Customer Number 
ePlanReviewNo
Description
(ASG - BANNER BANK BUILDING - 2ND STORY UNIT 270) The fire sprinkler system is used for high rise and for story increase. Permit is to remodel an existing 1,678 sq. ft. business space on the 2nd story of a high rise building. Approval is contingent upon adhering to the approved plans on file. Work to include: new installation of interior non-bearing walls using the NXTWALL System to create (5) offices, Reception Area, Storage Room, Conference Room, relocate fixtures, mechanical, and interior finishes in compliance with Ch. 8 of the 2015 IBC. Previous tenant was "Pacificad" under permit BLD15-02907. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  5/21/2019 DONE
emailed to Marva@tenhandbannock.com
First Notice 5/10/20195/6/2019 DONE
mailed 5-10-19
Permanent Occupancy  4/30/2019 DONE
BLD-Final4/22/20194/23/20194/23/2019APASS
DetailsDave Hannah
Phone #: 2088415809 >> Inspection requested via mobile web by Mike
BLD-Final4/10/20194/10/20194/10/2019PPART
DetailsDave Hannah
Phone #: 2088415809 >> Inspection requested via mobile web by Mike ok for temp occ needs to change door hardwear on conf room door
FIRE-Final Inspection4/9/20194/9/20194/9/2019PPASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.

> Inspection requested via mobile web by Mike
BLD-Framing/Rough-in4/1/20194/2/20194/2/2019PPASS
DetailsDave Hannah
Call prior to going Phone #: 2088415809 >> Inspection requested via mobile web by Mike
Issue PAID IN FULL permit  3/20/2019 DONE
Plan assigned to (BJM)2/26/20192/26/20193/7/2019 DONE
DetailsBrian McGowan
03/11 (L2 #518) - AGS paper plan
Routing - PLAN CHECK2/28/2019 3/7/2019 PASS
DetailsBrian McGowan
1st review completed  3/7/2019 DONE
DetailsBrian McGowan
Case Summary (BLD)  3/7/2019 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/7/2019 DONE
DetailsBrian McGowan
Permit Ready to Issue  3/7/2019 DONE
NEED TO SIGN PERMIT AND SCAN IN
Print Occupancy Form  3/7/2019 DONE
Telephone call  3/7/2019 DONE
Left voicemail for GC(Gary) to inform him the permit is ready, what fees are due and that we need the application sign.
Routing - PUBLIC WORKS  2/28/2019 PASS
Routing - Addressing2/26/2019 2/27/2019 PASS
DetailsDoug Chausow
Suite 270
Intake Approval  2/26/2019  
DetailsBrian McGowan
Recd Pcfee & Taken To Pln CK  2/26/2019 DONE