BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Tell Riley
|
|
|
//Work complete//electrical work final//smoke detection system in home//
|
DOC - Permit Finaled | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Ceiling Grid Inspection | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | CANC |
Tell Riley
|
|
|
Greg Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 3/8/2019 | | DONE |
|
|
|
|
Telephone call | | | 2/28/2019 | | DONE |
|
|
|
Check signed. Attempt to get someone here to sign this check. Called the phone number on the check and left a message. Called the cell number on the app and left a message. sent an email stating that until this issue is resolved, the permit will remain in ready status
|
CHANGE STATUS TO (ISS) | | | 2/28/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 2/27/2019 | 2/27/2019 | 2/27/2019 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 2/27/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/27/2019 | | 2/27/2019 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 2/27/2019 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 2/27/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2019 | | DONE |
Brian McGowan
|
|
|
|
Issue PAID IN FULL permit | | | 2/27/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/27/2019 | | DONE |
|
|
|
|
Application received | | 2/27/2019 | | | |
|
|
|
|