Permit Information
Permit NumberBLD19-00608
StatusIssued
Name JH DEVELOPMENT INC
Site Address 1401 S COLOMA PL
Project NameCabana
Customer Number 
ePlanReviewNo
Description
Permit to build a 240sq' (12'x20') free standing detached patio cover. All work per plans, notations, engineering, local codes & ordinances. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/24/20201/24/20201/24/2020 DEFR
DetailsBrandon Shaw
Extend Permit 90/180 days1/24/20201/24/20201/24/2020PDEFR
DetailsBrandon Shaw
PubWorks Subgrade Approval10/8/201910/8/201910/8/2019 DONE
DetailsMelissa Jannusch
*Cabana footings* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

PubWorks Occupancy Approval10/8/201910/8/201910/8/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
Permit Ready to Issue  3/11/2019 DONE
Issue PAID IN FULL permit  3/11/2019 DONE
Plan assigned to (JAB) Josh2/27/20192/27/20193/5/2019 PASS
DetailsJosh Bogle
3/5 cabana, paper
Routing - PLAN CHECK2/28/2019 3/5/2019 PASS
DetailsJosh Bogle
1st review completed  3/5/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  3/5/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  3/5/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  3/5/2019 DONE
DetailsJosh Bogle
Routing - Erosion and Sediment2/27/2019 3/4/2019 PASS
DetailsMichael Zawacki
applicant asking for this project to use existing permit, ESC17-01749
OK to add to ESC17-01749. Permit is active and being inspected.
Routing PW Grading-Hillside2/27/2019 2/28/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing Walk-In (Zoning)2/27/20192/27/20192/27/2019ADONE
DetailsEthan Mansfield
Routing Walk-In (BLD)2/27/20192/27/20192/27/2019APASS
DetailsJosh Bogle
took in for Hillside & ESC routing
Application received 2/27/2019