BLD-Aging Inspection | 1/24/2020 | 1/24/2020 | 1/24/2020 | | DEFR |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 1/24/2020 | 1/24/2020 | 1/24/2020 | P | DEFR |
Brandon Shaw
|
|
|
|
PubWorks Subgrade Approval | 10/8/2019 | 10/8/2019 | 10/8/2019 | | DONE |
Melissa Jannusch
|
|
|
*Cabana footings* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
PubWorks Occupancy Approval | 10/8/2019 | 10/8/2019 | 10/8/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
Permit Ready to Issue | | | 3/11/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/11/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 2/27/2019 | 2/27/2019 | 3/5/2019 | | PASS |
Josh Bogle
|
|
|
3/5 cabana, paper
|
Routing - PLAN CHECK | 2/28/2019 | | 3/5/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/5/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/5/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/5/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/5/2019 | | DONE |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | 2/27/2019 | | 3/4/2019 | | PASS |
Michael Zawacki
|
|
|
applicant asking for this project to use existing permit, ESC17-01749
OK to add to ESC17-01749. Permit is active and being inspected.
|
Routing PW Grading-Hillside | 2/27/2019 | | 2/28/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing Walk-In (Zoning) | 2/27/2019 | 2/27/2019 | 2/27/2019 | A | DONE |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 2/27/2019 | 2/27/2019 | 2/27/2019 | A | PASS |
Josh Bogle
|
|
|
took in for Hillside & ESC routing
|
Application received | | 2/27/2019 | | | |
|
|
|
|