BLD-Final | 8/21/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Tell Riley
|
|
|
Stacey Phone #: ###-####//fire place installed and inspected//final is complete//
|
DOC - Permit Finaled | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 7/3/2019 | 7/5/2019 | 7/5/2019 | A | NR |
Tell Riley
|
|
|
Stacy Phone #: ###-####//addition complete pending fireplace install and inspection//
|
BLD-Energy code compliance | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
Jim Sly
|
|
|
Rogers Phone #: ###-####
|
BLD-Framing/Rough-in | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PASS |
Jim Sly
|
|
|
John-(GC) Phone #: ###-####
|
BLD-Wall Bracing | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | PASS |
Jim Sly
|
|
|
Keith Phone #: ###-####
|
BLD-Foundation | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Jim Sly
|
|
|
Jerry Phone #: ###-####
|
BLD-Footing | 3/15/2019 | 3/18/2019 | 3/18/2019 | A | PASS |
Dave Hannah
|
|
|
Jerry-pour time 10:00 Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/13/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 3/12/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 2/28/2019 | 2/28/2019 | 3/12/2019 | | PASS |
Josh Bogle
|
|
|
3/6 addition, paper - 1st done
|
Routing - PLAN CHECK | 3/8/2019 | | 3/12/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/12/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/12/2019 | | DONE |
|
|
|
|
Routing - MECHANICAL | 3/7/2019 | | 3/8/2019 | | PASS |
Troy James
|
|
|
|
Plan Reviewer's activity | | | 3/7/2019 | | DONE |
Josh Bogle
|
|
|
printed ACCA report - routed to Mechanical
|
Routing - PLAN CHECK | 2/28/2019 | | 2/28/2019 | | FAIL |
Josh Bogle
|
|
|
missing ACCA report
|
1st review completed | | | 2/28/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 2/27/2019 | 2/27/2019 | 2/27/2019 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 2/27/2019 | 2/27/2019 | 2/27/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level two - needs ACCA report
|
Application received | | 2/27/2019 | | | |
|
|
|
|