BLD-Framing/Rough-in | 3/12/2019 | 3/12/2019 | 3/13/2019 | P | PASS |
Jim Sly
|
|
|
Call ahead - prefer late in pm // Andy Phone #: ###-####
|
Permit Ready to Issue | | | 3/4/2019 | | DONE |
|
|
|
|
Telephone call | | | 3/4/2019 | | DONE |
|
|
|
spoke with robert informing him that this permit is ready and the fee amount due (inculding ele).
|
Issue PAID IN FULL permit | | | 3/4/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 2/28/2019 | 2/28/2019 | 3/1/2019 | | PASS |
Josh Bogle
|
|
|
3/6 remodel, paper - 1st done
|
Routing - PLAN CHECK | 3/1/2019 | | 3/1/2019 | | FAIL |
Josh Bogle
|
|
|
plan lack clarity - called and emailed applicant
|
1st review completed | | | 3/1/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/1/2019 | | 3/1/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/1/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/1/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2019 | | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 2/27/2019 | 2/27/2019 | 2/27/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level two - no time for same-day review
|
Application received | | 2/27/2019 | | | |
|
|
|
|