BLD-Final | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Cassandra Hessing
|
DOC - Permit Finaled | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Dave Hannah
|
|
|
|
Plan assigned to (J_N) | 3/20/2019 | 3/20/2019 | 3/21/2019 | | DONE |
Jenny Nelson
|
|
|
03/21 egress window, ePlan. 1st complete, show elevation with sill height
|
1st review completed | | | 3/21/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 3/21/2019 | | 3/21/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2019 | | DONE |
Jenny Nelson
|
|
|
ESC no, Energy no
|
Permit Ready to Issue | | | 3/21/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/21/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/15/2019 | | 3/21/2019 | | FAIL |
Jenny Nelson
|
|
|
Show elevation with sill height for egress window
|
Plan assigned to (JAB) Josh | 3/15/2019 | 3/15/2019 | 3/20/2019 | | DEFR |
Josh Bogle
|
|
|
3/21 egress window, ePlan
|
Routing - PLANNING | 3/15/2019 | | 3/15/2019 | | PASS |
Sue Cummings
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/15/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/15/2019 | | DONE |
|
|
|
no fee taken at intake 406
|
Intake Approval | | | 3/15/2019 | | PASS |
|
|
|
|
Meeting | | | 3/8/2019 | | DONE |
|
|
|
Emailed Cassandra to ask if she is changing the size of the windows are doing same for same size.
|
Intake Approval | | | 3/8/2019 | | FAIL |
|
|
|
1.Please provide a site plan of the whole recorded parcel with set backs.
2. Provide a floor plan with the rooms labeled and the size of the window.
|
Application received | | | 2/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 28 2019 9:22AM
|