Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-00630
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1055 N CURTIS RD
Project NameSARMC 3N Cath Lab #2 Remodel
Customer Number 
ePlanReviewYes
Description
(SARMC - 3RD STORY - EAST END OF NORTH TOWER - CATH LAB #2) // 06/17/19 PLAN MOD TO ADD UPS EQUIPMENT IN BASEMENT ELECTRICAL ROOM AND AIR CONDITIONING UNIT. JAR // Permit too remodel an existing 690 sq ft Cath Lab on the 3rd Floor. Work to include: demo of existing finishes, cabinetry, sink, suspended ceiling, non-bearing partition walls and doors; construction of new non-bearing interior partition walls; lead shielding; suspended acoustical ceiling; gypsum board ceiling; gypsum board soffit; medical equipment, structural reinforcement for new equipment; new door; cabinets and millwork; mechanical, plumbing, and electrical work; and new finishes in compliance with Ch. 8 of the 2015 IBC. Special inspection per attached Form 310. The work is located entirely within an existing smoke compartment. While transporting the new medical equipment through the building and while staging for installation, floors and elevators are not allowed to be overloaded. The work is required to comply with the approved drawings and with all applicable codes and ordinances. The fire sprinkler system is used for high-rise and for occupancy. Any alterations or modifications to the building’s Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 and NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/12/20198/12/2019 DONE
This permit finaled on the web by Brandon Byington
First Notice7/16/20197/16/20198/2/2019 DONE
DetailsMike Jordan
mailed out 8/5/19
Letter of compliance/Occupancy  7/17/2019 DONE
BLD-Final7/16/20197/16/20197/16/2019PPASS
DetailsMike Jordan
Ceil Phone #: ###-####
DOC - Permit Finaled7/16/20197/16/20197/16/2019PPASS
DetailsMike Jordan
FIRE-Final Inspection6/28/20196/28/20196/28/2019PPASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire exitnguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete.
BLD-Final6/28/20196/28/20196/28/2019PCANC
DetailsMike Jordan
Cecil Phone #: ###-####
Plan assigned to (JAR)6/3/20196/3/20196/17/2019 DONE
DetailsJulie Romig
06/21 - 2nd Rev - 1st Rev Comp - Plan Mod SARMC Cath Lab
Routing - Design Review6/17/2019 6/17/2019 PASS
DetailsJosh Wilson
New condenser ok JGW
Routing - PLAN CHECK6/17/2019 6/17/2019 PASS
DetailsJulie Romig
Permit Ready to Issue  6/17/2019 DONE
plan mod please do not re issue
CHANGE STATUS TO (ISS)  6/17/2019 DONE
Inspection Record Card- Bld  6/17/2019 DONE
Inspection Record Card- Bld  6/17/2019 DONE
Routing - MECHANICAL6/6/2019 6/12/2019 PASS
DetailsTroy James
Routing - PLAN CHECK6/6/2019 6/11/2019 PASS
DetailsJulie Romig
BLD-Ceiling Grid Inspection6/6/20196/7/20196/7/2019PPASS
DetailsMike Jordan
Cecil Phone #: ###-####
Plan Modification Accepted  6/3/2019 DONE
the addition of a UPS equipment in the basement electrical room and the required air conditioning associated with it
Inspection Record Card- Bld  5/15/2019 DONE
Issue PAID IN FULL permit  5/10/2019 DONE
Plan assigned to (JAR)3/29/20193/29/20195/8/2019 DONE
DetailsJulie Romig
05/08 - 2nd Rev - 1st Rev Comp - L3 SARMC Cath Lab #2 Remodel
Routing - PLAN CHECK4/30/2019 5/8/2019 PASS
DetailsJulie Romig
Routing Off Site - STRUCTURAL4/30/2019 5/8/2019 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  5/8/2019 DONE
Permit Ready to Issue  5/8/2019 DONE
all met
Need GC
Need rev cert of val
Route to Impact Fee Review4/23/20194/26/20194/24/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - FIRE3/29/20193/29/20194/23/2019 PASS
DetailsMark Scharfen
IFC review complete 04.23.2019. IFC Fire 04.23.2019.pdf uploaded.
1st review completed  4/23/2019 FAIL
DetailsJulie Romig
Routing - PLAN CHECK3/29/2019 4/23/2019 FAIL
DetailsJulie Romig
Need Form 310 completed.
Routing Off Site - STRUCTURAL3/29/2019 4/15/2019 FAIL
DetailsJulie Romig
KPFF
Routing - PUBLIC WORKS3/29/2019 4/3/2019 PASS
DetailsAngela Hardy
Routing - MECHANICAL3/29/2019 4/1/2019 PASS
DetailsTroy James
Routing - Addressing3/29/2019 3/29/2019 PASS
DetailsDoug Chausow
Intake Approval  3/27/2019 PASS
Intake Approval  3/21/2019 FAIL
DetailsJoe Bruce
Please provide the following to complete your prescreen:
1) Upload and provide form #304 - Registered Design Professional Form
2) Upload and provide Structural Calculations stamped and signed by engineer.
3) Upload and provide form #310 - Statement of special inspections stamped by engineer for the special inspections noted on sheet S0.01.
Application received  2/28/2019 DONE
Application submitted via PDS Online on Feb 28 2019 11:49AM