BLD-Final | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Mike Jordan
|
|
|
Garage code 7530 Phone #: ###-#### Inspection requested via web by Rustin Ray
|
DOC - Permit Finaled | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Mike Jordan
|
|
|
handrail has been installed.
|
BLD-Final | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | FAIL |
Mike Jordan
|
|
|
Garage code 7530 Phone #: ###-#### Inspection requested via web by Rustin Ray. Provide code compliant handrail on stairs to crawl space storage.
|
BLD-Blower Door Test Results | 7/18/2019 | 7/18/2019 | 7/18/2019 | A | DONE |
Mike Jordan
|
|
|
4.7
|
BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | NR |
Mike Jordan
|
|
|
Garage code 7530 Phone #: ###-#### Inspection requested via web by Rustin Ray. Mech. final inspection has failed.
|
BLD-Energy code compliance | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray
|
BLD-Framing/Rough-in | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray
|
BLD-Framing/Rough-in | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray. Install A2.5 on A1 thru A5 trusses. Nail 2ply C3 trusses per the engineering. Provide approved fixes for A6 and A7 trusses. Nail of hangars on E3 and E4 trusses. Tempered glazing required at windows next to soaker tub and shower/tub. Correction notice posted. OK to insulate.
|
BLD-Wall Bracing | 4/26/2019 | 4/29/2019 | 4/29/2019 | A | PASS |
Mike Jordan
|
|
|
Spencer Phone #: ###-####
|
BLD-Foundation | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PASS |
Jim Sly
|
|
|
ready for 9 am inspection Phone #: ###-#### Inspection requested via web by Jay Jones
|
BLD-Foundation | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | PART |
Brandon Shaw
|
|
|
Foundation stem walls and basement slab...
|
OVERRIDE | | | 3/27/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 3/21/2019 | 3/21/2019 | 3/27/2019 | | DONE |
Jenny Nelson
|
|
|
1st complete 3/25, need more details for new crawl storage.
|
Routing - PLAN CHECK | 3/27/2019 | | 3/27/2019 | | PASS |
Jenny Nelson
|
|
|
1 hour plan mod fee
|
Permit Ready to Issue | | | 3/27/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 3/27/2019 | | DONE |
|
|
|
PLAN MOD
|
Inspection Record Card- Bld | | | 3/27/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/22/2019 | | 3/25/2019 | | FAIL |
Jenny Nelson
|
|
|
|
BLD-Footing | 3/21/2019 | 3/21/2019 | 3/21/2019 | A | PART |
Mike Jordan
|
|
|
Request a late morning inspection Phone #: ###-#### Inspection requested via web by Ben Sears. Footing ok. Will need to submit plan mod for basement. Ok to place footings and stemwalls at this time. Will need plan mod prior to moving foward.
|
Plan Modification Accepted | | | 3/21/2019 | | DONE |
|
|
|
Changing foundation, adding 5 ft cellar
|
OVERRIDE | | | 3/18/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/18/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/18/2019 | | DONE |
|
|
|
|
Plan assigned to (J_N) | 3/13/2019 | 3/13/2019 | 3/15/2019 | | DONE |
Jenny Nelson
|
|
|
03/18 sfd L1 ePlan. 1st complete 3/13, window headers with girder load
|
Routing - FIRE | 3/13/2019 | 3/13/2019 | 3/15/2019 | | PASS |
Lee G Meredith
|
|
|
04/15 Stetson Homes 402
Fire flow not provided. Access distance exceeded. Emailed a copy of the review to the applicant and Jenny.
3-15-19: Rustin Ray indicated that the owner will provide a driveway rated at 75K lbs. This provides access distance of less than 150 feet. SUEZ fire flow letter indicates adequate fire flow.
|
Routing - PLAN CHECK | 3/15/2019 | | 3/15/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 3/15/2019 | | DONE |
Judith Amador
|
|
|
met
|
1st review completed | | | 3/14/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Plan assigned to (BJM) | 3/5/2019 | 3/5/2019 | 3/13/2019 | | DEFR |
Brian McGowan
|
|
|
03/18 (sfd, L1) ePlan
|
Routing - PLAN CHECK | 3/5/2019 | | 3/13/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 3/5/2019 | 3/8/2019 | 3/6/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 3/5/2019 | | 3/6/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Addressing | 3/5/2019 | | 3/6/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/5/2019 | | 3/5/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 3/5/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/5/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/5/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 3/5/2019 | | 3/5/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Application received | | | 2/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 28 2019 12:11PM
|
Routing - PLANNING | 3/22/2019 | | | | PASS |
Ethan Mansfield
|
|
|
|