BLD-Final | 5/15/2019 | 5/15/2019 | 5/16/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kristen Dittman
|
DOC - Permit Finaled | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | PART |
Brandon Shaw
|
|
|
Ledger and beam (2) connection to corner of house...
|
BLD-Conference | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | PASS |
Brandon Shaw
|
|
|
Footing... Ok to pour...
|
PubWorks Subgrade Approval | 3/29/2019 | 3/29/2019 | 3/29/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 3/26/2019 | 3/28/2019 | 3/28/2019 | P | NR |
Brandon Shaw
|
|
|
Need soil subgrade submitted and approved by PW...
|
Plan assigned to (J_N) | 3/12/2019 | 3/12/2019 | 3/12/2019 | | DONE |
Jenny Nelson
|
|
|
1st complete 3/12, waiting for hillside review.
|
Plan assigned to (JAB) Josh | 3/6/2019 | 3/6/2019 | 3/12/2019 | | DEFR |
Josh Bogle
|
|
|
3/12 deck, ePlan - WUI
|
Routing - PLAN CHECK | 3/6/2019 | | 3/12/2019 | | PASS |
Jenny Nelson
|
|
|
Not routed to hillside and intake, waiting for hillside review
|
Routing PW Grading-Hillside | 3/12/2019 | | 3/12/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Plan Reviewer's activity | | | 3/12/2019 | | DONE |
Jenny Nelson
|
|
|
Routed to hillside, wasn't routed at initial intake
|
1st review completed | | | 3/12/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/12/2019 | | DONE |
Jenny Nelson
|
|
|
ESC no, Energy no
|
Permit Ready to Issue | | | 3/12/2019 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 3/12/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 3/6/2019 | | 3/7/2019 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 3/6/2019 | | FAIL |
|
|
|
drawings are all sidweways- need to turn
|
Plans ACCEPTED BY PLAN TECH | | | 3/6/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/6/2019 | | DONE |
|
|
|
no plan check fee taken at intake, 406
|
Intake Approval | | | 3/6/2019 | | PASS |
|
|
|
|
Telephone call | | | 3/5/2019 | | DONE |
|
|
|
Spoke with applicant to talk about what corrections are needed. Per applicant deleted all drawings in the drawings folder so they can upload them correctly.
|
Intake Approval | | | 3/1/2019 | | FAIL |
|
|
|
Need- drawings to be individual and a cross section
|
Application received | | | 2/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 28 2019 2:06PM
|