BLD-Blower Door Test Results | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | DONE |
Tell Riley
|
|
|
6.9 ACH50
|
BLD-Final | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
Tell Riley
|
|
|
Call if need garage door code. Thanks! Phone #: ###-#### Inspection requested via web by Aron Mock
|
DOC - Permit Finaled | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 11/11/2019 | 11/12/2019 | 11/12/2019 | A | NR |
Tell Riley
|
|
|
Please call for garage code. Thanks! Phone #: ###-#### Inspection requested via web by Aron Mock//needs mechanical final passed//
|
BLD-Framing/Rough-in | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Tell Riley
|
|
|
As late as possible please. Nailed engineering to outside wall near straps. Please call with any issues. Insulation too please. Phone #: ###-#### Inspection requested via web by Aron Mock//corrections made//framing approved for cover//insulation ok//
|
BLD-Energy code compliance | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | NR |
Tell Riley
|
|
|
Framing also please call with any concerns Phone #: ###-#### Inspection requested via web by Aron Mock//install MSTC straps per plans on canitilever wall area(noted on correction notice from Dave Hannah)//
|
BLD-Framing/Rough-in | 6/18/2019 | 6/18/2019 | 6/18/2019 | P | FAIL |
Dave Hannah
|
|
|
Approved plans, truss engineering and engineering are in the kitchen area. Please let me know if you have any concerns. Phone #: ###-#### Inspection requested via web by Aron Mock needs to install hold downs
|
BLD-Wall Bracing | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Dave Hannah
|
|
|
Framers on site if there are issues Phone #: ###-#### Inspection requested via web by Aron Mock
|
BLD-Wall Bracing | 5/29/2019 | 5/29/2019 | 5/29/2019 | A | PART |
Brandon Shaw
|
|
|
First floor only... Re-nail sill plate with approved fasteners...
|
BLD-Foundation | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Jim Sly
|
|
|
Jose Phone #: ###-####
|
BLD-Footing | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | PASS |
Jim Sly
|
|
|
Jose Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/19/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/19/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 4/3/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 3/8/2019 | 3/8/2019 | 4/3/2019 | | DONE |
Rob Patrick
|
|
|
03/21 sfd L1 ePlan...03/19 Failed
|
Routing - PLAN CHECK | 4/3/2019 | | 4/3/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/3/2019 | | DONE |
|
|
|
met
|
1st review completed | | | 3/19/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | 3/8/2019 | | 3/19/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Route to Impact Fee Review | 3/8/2019 | 3/11/2019 | 3/11/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 3/8/2019 | | 3/11/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 3/8/2019 | | 3/11/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/8/2019 | | 3/8/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLANNING | 3/8/2019 | | 3/8/2019 | | PASS |
Sue Cummings
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/8/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/8/2019 | | DONE |
|
|
|
|
Intake Approval | | | 3/8/2019 | | PASS |
|
|
|
|
Intake Approval | | | 3/6/2019 | | FAIL |
|
|
|
I didn't do the prescreen-The sizes for the drawings are wrong-must be at least 18X 24 in size and you will need to turn the drawings so they face the correct way. Landscape style so they can be read-also can you please fill in the blanks on the checklist? That way you'll make sure you have everything we require. Once you rotate the drawings and make them the correct size please sign off on your task and we'll start the prescreen.
|
Application received | | | 3/1/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 1 2019 12:16PM
|