DOC - Permit Expired | 4/2/2020 | 4/2/2020 | 4/2/2020 | | PASS |
|
|
|
Residential-R105.5 or Commercial 105.5 Expiration. Every permit issued by the building official under the provisions of this chapter shall expire by limitation and become null and void if the building or work authorized by such permit is not
commenced within one calendar year from the date of issuance of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 calendar days.
|
BLD-Footing | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | CANC |
Brandon Shaw
|
|
|
No footing required for this permit...
|
Plan assigned to (BJM) | 3/7/2019 | 3/7/2019 | 4/5/2019 | | DONE |
Brian McGowan
|
|
|
CSN19-00053 - must pass planning
|
Issue PAID IN FULL permit | | | 4/2/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/19/2019 | | 3/28/2019 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 3/28/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/28/2019 | | DONE |
|
|
|
|
Meeting | | | 3/28/2019 | | DONE |
|
|
|
waiting to hear back from sue about CSN still being in REC status
|
Routing - PLAN CHECK | 3/28/2019 | | 3/19/2019 | | FAIL |
Brian McGowan
|
|
|
|
Intake Approval | | | 3/7/2019 | | PASS |
|
|
|
|
Application received | | | 3/1/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 1 2019 3:49PM
|