BLD-Final | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PEND |
Tony Young
|
|
|
Josh *screened* Phone #: ###-####557,, temp occupancy ok
|
BLD-Conference | 8/4/2020 | 8/5/2020 | 8/4/2020 | A | DONE |
Tony Young
|
|
|
Josh *screened* Phone #: ###-####557
|
BLD-Wall cover | 7/13/2020 | 7/14/2020 | 7/14/2020 | P | PART |
Tony Young
|
|
|
SCREENED // Josh Phone #: ###-####// temp occupancy ok.. pending trades on full occ.,, contractor will deliver final letters of ok from engineers for records
|
PubWorks Occupancy Approval | 7/14/2020 | 7/14/2020 | 7/14/2020 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval Temp | 7/14/2020 | 7/14/2020 | 7/14/2020 | | DONE |
David Moser
|
|
|
Current Planning for Temp C of O
|
CHANGE STATUS TO (ISS) | | | 7/13/2020 | | DONE |
|
|
|
NOT SHOWING WHY IN FNL STATUS. CONTRACOR CALLING IN FOR FINAL
|
FIRE-Final Inspection | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Greg Ruxton
|
|
|
Fire Life Safety inspection passed. Building inspector to verify main entry doors panic hardware is code compliant for egress and over rides electric strike card reader once system is fully operational.
Josh *screened* Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####.. kitchen and restrooms ok
|
BLD-Aging Inspection | 6/18/2020 | 6/18/2020 | 6/24/2020 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/17/2020 | 6/17/2020 | 6/24/2020 | | PASS |
Tony Young
|
|
|
|
BLD-Ceiling Grid Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 | P | PASS |
Dave Hannah
|
|
|
Josh *screened* Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/1/2020 | 4/2/2020 | 4/2/2020 | A | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/30/2020 | 3/30/2020 | 3/30/2020 | P | PASS |
Jim Storey
|
|
|
Josh Phone #: ###-#### area b ok
|
BLD-Framing/Rough-in | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####,, kitchen areas ok
|
BLD-Energy code compliance | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PART |
Tony Young
|
|
|
Josh Phone #: ###-####// area C ok pending trades
|
FIRE-Conference | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | CANC |
Jim Page
|
|
|
Josh ###-####
|
FIRE-Conference | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | DONE |
Jim Page
|
|
|
Follow up conference scheduled for 16JAN2020 for question asked about attic sprinkler coverage, need further verification for sprinkler head coverage in question.
Josh Phone #: ###-####
|
BLD-Energy code compliance | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | PART |
Dave Hannah
|
|
|
Josh Phone #: ###-#### ext walls west wing ok
|
BLD-Framing/Rough-in | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PART |
Tony Young
|
|
|
Josh Phone #: ###-####// n/west area wing ok to insulate
|
BLD-Energy code compliance | 12/26/2019 | 12/27/2019 | 12/27/2019 | A | PART |
Tony Young
|
|
|
Josh Phone #: ###-####,, east wing ok
|
BLD-Framing/Rough-in | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | PART |
Dave Hannah
|
|
|
jOSH Phone #: ###-#### area ( B ) ok to insulate.
|
BLD-Conference | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | PART |
Tony Young
|
|
|
Josh Phone #: ###-####,, interior shear,, roof details, roof insulation,, extensive walk through,, Josh will note on plans
|
BLD-Other | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | PART |
Tony Young
|
|
|
roof nailing // Josh Phone #: ###-####,, work in progress,, ok
|
BLD-Framing/Rough-in | 11/19/2019 | 11/20/2019 | 11/20/2019 | P | PART |
Tony Young
|
|
|
Josh Phone #: ###-####// area C wall bracing ok
|
BLD-Other | 11/7/2019 | 11/8/2019 | 11/8/2019 | P | PART |
Tony Young
|
|
|
roof nailing // Josh Phone #: ###-####,, ok after re-nailing missed areas marked by paint,, north/west building
|
BLD-Wall Bracing | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | PART |
Tony Young
|
|
|
north buildings // Josh Phone #: ###-####,, work in progress,, ok to cover after finishing
|
BLD-Other | 11/6/2019 | 11/7/2019 | 11/7/2019 | P | PART |
Tony Young
|
|
|
roof nailing // Josh Phone #: ###-####,, partial on area A,, need to redo some and finish upper areas
|
BLD-Other | 10/30/2019 | 10/31/2019 | 10/31/2019 | P | PART |
Tony Young
|
|
|
roof nailing // Josh Phone #: ###-####,, area B and the gym ok
|
BLD-Conference | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Tony Young
|
|
|
Josh - Framing questions, wanted a consultation Phone #: ###-####,, fireblock ?s, bracing ?s
|
BLD-Foundation | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PEND |
Tony Young
|
|
|
rebar // Josh Phone #: ###-####,, pending special inspection
|
BLD-Other | 9/26/2019 | 9/27/2019 | 9/27/2019 | P | PEND |
Tony Young
|
|
|
2pm - grout and rebar // Josh Phone #: ###-####
|
BLD-Other | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Tony Young
|
|
|
grout // Josh Phone #: ###-####,, pending special inspection
|
BLD-Footing | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | PART |
Tony Young
|
|
|
rebar // Josh Phone #: ###-####,, pending special inspection results
|
BLD-Foundation | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PART |
Tony Young
|
|
|
rebar // josh Phone #: ###-####,, pending special inspection
|
BLD-Footing | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PART |
Tony Young
|
|
|
Josh Phone #: ###-####,, pending special inspection reports
|
BLD-Footing | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PART |
Tony Young
|
|
|
Josh Phone #: ###-####,, area C
|
BLD-Footing | 8/28/2019 | 8/29/2019 | 8/29/2019 | P | PEND |
Tony Young
|
|
|
Josh- rebar inspection and footing wall Phone #: ###-####,, pending special inspection report
|
BLD-Foundation | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PEND |
Tony Young
|
|
|
wall rebar // Josh Phone #: ###-####,, special inspection
|
BLD-Concrete | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | PART |
Tony Young
|
|
|
rebar-Josh Phone #: ###-####
|
BLD-Foundation | 8/19/2019 | 8/20/2019 | 8/20/2019 | A | PART |
Tony Young
|
|
|
foundation insulation // Josh Phone #: ###-####,, work oin progress,, special inspector reports
|
BLD-Foundation | 8/14/2019 | 8/15/2019 | 8/15/2019 | P | PART |
Tony Young
|
|
|
Josh Phone #: ###-####,, stem wall,, pending special inspection reports
|
BLD-Foundation | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PEND |
Tony Young
|
|
|
rebar // Izaak Phone #: ###-####,, pending S, I. report
|
BLD-Footing | 8/6/2019 | 8/7/2019 | 8/8/2019 | P | PART |
Tony Young
|
|
|
rebar // Issac Phone #: ###-####.. special inspector to be on site
|
BLD-Foundation | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PART |
Tony Young
|
|
|
rebar // Issac Phone #: ###-####,, pending special inspection report,, not pouring until Thursday
|
BLD-Foundation | 7/31/2019 | 8/1/2019 | 8/1/2019 | P | PART |
Tony Young
|
|
|
rebar // Josh Phone #: ###-####,, grid L and 3,, s/w gym area, deep footings,, pending special reports,, MTI
|
Issue PAID IN FULL permit | | | 6/28/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/28/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/27/2019 | | DONE |
|
|
|
customer came in to pick up permit but all fees had not been paid. Gave him the fees due so he could give it to the school dist
|
OVERRIDE | | | 5/16/2019 | | |
|
|
|
|
Plan assigned to (JAR) | 3/21/2019 | 3/21/2019 | 5/16/2019 | | DONE |
Julie Romig
|
|
|
05/16 - 4th Rev - 1st Rev Comp - 502 Highlands Elementary - **Expedited Review**
|
Routing - PLAN CHECK | 5/10/2019 | | 5/16/2019 | | PASS |
Julie Romig
|
|
|
4th Review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/16/2019 | | DONE |
|
|
|
NEED
ACHD
MET (ROBH@CMCOMPANY.COM)
GC FORM
REVISED VALUE (SCHOOL PROJECT DON'T GO OVER STATES PLAN CHECK FEE)
|
Routing - ELECTRICAL | 5/10/2019 | | 5/13/2019 | | PASS |
Javier Guzman
|
|
|
4th Review
|
Routing - FIRE | 5/1/2019 | 5/1/2019 | 5/7/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 5/1/2019 | | 5/7/2019 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview. Contacted applicant to discuss.
|
Routing - ELECTRICAL | 5/1/2019 | | 5/3/2019 | | FAIL |
Javier Guzman
|
|
|
Previous changemark request not addressed emailed applicant to try and resolve.
|
Routing PW Sewer Design | 5/1/2019 | | 5/2/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - PLAN CHECK | 4/18/2019 | | 4/25/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing PW Drainage | 4/18/2019 | | 4/25/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 4/17/2019 | 4/17/2019 | 4/24/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - ELECTRICAL | 4/17/2019 | | 4/24/2019 | | FAIL |
Javier Guzman
|
|
|
Previous changemark request not addressed.
|
Routing Off Site - STRUCTURAL | 4/18/2019 | | 4/22/2019 | | PASS |
Julie Romig
|
|
|
KPFF
|
Routing PW Sewer Design | 4/18/2019 | | 4/18/2019 | | FAIL |
DeAnn Brown
|
|
|
See changemarks on sheet C2 (demo) and C5 (utility).
|
Route to Impact Fee Review | 4/8/2019 | 4/11/2019 | 4/9/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 4/8/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 3/21/2019 | | 4/8/2019 | | FAIL |
Julie Romig
|
|
|
KPFF
|
Routing PW Flood Plain | 3/26/2019 | | 4/5/2019 | | PASS |
Jason C. Taylor
|
|
|
Project is outside Special Flood Hazzard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
Routing - FIRE | 3/21/2019 | 3/21/2019 | 4/3/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - PLAN CHECK | 3/21/2019 | | 4/3/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - ELECTRICAL | 3/21/2019 | | 4/2/2019 | | FAIL |
Javier Guzman
|
|
|
04/03 - **Expedited Review ** - 502 Highlands Elementary
|
Routing PW Environmental | 3/26/2019 | | 4/1/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Drainage | 3/26/2019 | | 3/28/2019 | | FAIL |
Brian Murphy
|
|
|
need perc test soils
|
Routing PW Street Lights | 3/26/2019 | | 3/28/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING | 3/21/2019 | | 3/28/2019 | | PASS |
David Moser
|
|
|
|
Routing PW Sewer Design | 3/26/2019 | | 3/27/2019 | | FAIL |
DeAnn Brown
|
|
|
See changemarks. Manholes need labeling, show existing service connections on demo plan, finish label for sewer services, add tap permit notes.
|
Routing - MECHANICAL | 3/21/2019 | | 3/27/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Solid Waste | 3/26/2019 | | 3/27/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLUMBING | 3/21/2019 | | 3/26/2019 | | PASS |
Daryl Spivey
|
|
|
04/03 - **Expedited Review ** - 502 Highlands Elementary
Per plan and ISPC.
|
Routing - Addressing | 3/21/2019 | | 3/26/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/21/2019 | | 3/26/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 3/21/2019 | | 3/26/2019 | | PASS |
Michael Zawacki
|
|
|
Pre construction SWPPP. Still needs RP and all responsible parties added.
Site prep will be required.
|
Intake Approval | | | 3/21/2019 | | PASS |
Carl Westfall
|
|
|
Prescreen approved/fees paid 3/21/19
|
Plan Reviewer's activity | | | 3/20/2019 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 3/12/2019 | | FAIL |
|
|
|
Have not done a plan intake review because the filled out Form 502 Plan Intake Checklist has not been uploaded into the Documents Folder in ePlanReview. Upload the document and complete your task so that the Plan Intake review can be done.
|
Intake Approval | | | 3/12/2019 | | FAIL |
|
|
|
3-12-19 Refer to the circled item in the plan intake checklist. Resolve each item as directed. CJW
|
Intake Approval | | | 3/7/2019 | | FAIL |
|
|
|
Fill out and upload the 502 plan intake checklist into the Documents Folder in ePlanReview. Upload spec book 1 if there is one. “ehvejhdo.4xl” did not upload. Try again with a different file name. The 6 week timeframe for 1st review does not start until the plan intake review is approved and the plan review fee is paid. To avoid further delays, make sure everything that is required in the check list is uploaded. CJW
|
Application received | | | 3/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 4 2019 8:57AM
|