BLD-Final | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Tony Young
|
|
|
Zack Phone #: ###-####
|
DOC - Permit Finaled | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | NH |
Tony Young
|
|
|
Zack Phone #: ###-####,, will need address facing 18th also,, locked,, no answer
|
Zoning Approval | 9/20/2019 | 9/20/2019 | 9/20/2019 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Other | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
Tony Young
|
|
|
Zack- post for deck inspection Phone #: ###-####,, post footings ok
|
BLD-Energy code compliance | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Jim Storey
|
|
|
Zack Phone #: ###-####
|
BLD-Framing/Rough-in | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Jim Storey
|
|
|
Zack Phone #: ###-#### c/n mlbeams installed per revised engineering ok
|
BLD-Framing/Rough-in | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PART |
Dave Hannah
|
|
|
Zack Phone #: ###-#### ok to insulate need enginer to ok header over window c/n on site
|
BLD-Other | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Dave Hannah
|
|
|
Zack-air seal Phone #: ###-####
|
BLD-Wall Bracing | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | PART |
Tony Young
|
|
|
Zach Phone #: ###-####,, ok after redoing some areas
|
BLD-Footing | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | PASS |
Tony Young
|
|
|
Jerry Phone #: ###-####,, 2 new point load footings,, ok
|
Permit Ready to Issue | | | 4/15/2019 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 4/15/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 3/26/2019 | 3/26/2019 | 4/12/2019 | | PASS |
Josh Bogle
|
|
|
4/1 ADU, paper - 1st done
|
Routing - PLAN CHECK | 4/12/2019 | | 4/12/2019 | | PASS |
Josh Bogle
|
|
|
all good except for rim-joist cantilever bearing situation - permit being issued with deferred engineering submittals required
|
Inspection Record Card- Bld | | | 4/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/12/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Route to Impact Fee Review | 3/29/2019 | 4/3/2019 | 3/29/2019 | | PASS |
Eric Bilimoria
|
|
|
called Karina and left a message that they need to do a plan review on this ADU
|
1st review completed | | | 3/29/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/26/2019 | | 3/29/2019 | | FAIL |
Josh Bogle
|
|
|
engineering concerns - see email to Zach 3/29/19
|
Routing - PLANNING | 3/29/2019 | | 3/29/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 3/26/2019 | | 3/27/2019 | | PASS |
Doug Chausow
|
|
|
ADU Address: 1315 N 18th St
|
Routing - PUBLIC WORKS | 3/26/2019 | | 3/27/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing Walk-In (Zoning) | 3/26/2019 | 3/26/2019 | 3/26/2019 | A | FAIL |
Nicolette Womack
|
|
|
Need Recorded Deed Restriction and Historic BLD Review.
|
Routing Walk-In (Zoning) | 3/26/2019 | 3/26/2019 | 3/26/2019 | A | PASS |
KayCee Babb
|
|
|
Recorded ADU deed restriction with Ada County Recorded submitted as required by CAA19-00040.
|
Routing Walk-In (BLD) | 3/26/2019 | 3/26/2019 | 3/26/2019 | A | PASS |
Josh Bogle
|
|
|
took in as a level two and routed
|
Routing Walk-In (Zoning) | 3/4/2019 | 3/4/2019 | 3/4/2019 | A | FAIL |
KayCee Babb
|
|
|
ADU application approval required prior to submittal of Building permits.
|
Application received | | 3/4/2019 | | | |
|
|
|
|