BLD-Final | 9/23/2019 | 9/24/2019 | 9/25/2019 | A | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|
FIRE-Final Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Jim Page
|
|
|
No fire sprinkler modifications per this scope, no fire alarm modifications, per this scope, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for scope of work complete, signature not provided due to no signature card.
TOM Phone #: ###-####
|
BLD-Other | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Dave Hannah
|
|
|
fire proofing // Tom Phone #: ###-####
|
FIRE-Final Inspection | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | CANC |
Mark Scharfen
|
|
|
Wrong permit called in. Fire safeing, not life safety. Cancelled.
Tom Phone #: ###-####
|
BLD-Foundation | 4/24/2019 | 4/25/2019 | 4/26/2019 | A | PASS |
Dave Hannah
|
|
|
rebar // Tom Phone #: ###-#### floor infill at stairs ok
|
BLD-Framing/Rough-in | 4/23/2019 | 4/23/2019 | 4/25/2019 | P | PART |
Dave Hannah
|
|
|
Tom- shaft wall inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PART |
Tony Young
|
|
|
Tom Phone #: ###-####,, upper 2' extension ok to cover,, ?s on shaft design,, needs to be per UL listing,, or get a fix from architect
|
BLD-Framing/Rough-in | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/3/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/3/2019 | | DONE |
|
|
|
|
Telephone call | | | 4/3/2019 | | DONE |
|
|
|
Waiting for signed permit, sent email to: GC
|
Plan assigned to (JG) | 3/19/2019 | 3/19/2019 | 3/29/2019 | | PASS |
Javier Guzman
|
|
|
03/29 L2 Capitol Terrace 2nd Flr Shell ePlan
|
Routing - PLAN CHECK | 3/19/2019 | | 3/29/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 3/19/2019 | | 3/29/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Dave Haugland
|
1st review completed | | | 3/29/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/29/2019 | | DONE |
|
|
|
MET BRADY@GUHOCORP.COM
Need
GC form
Revised Value
|
Routing - PLUMBING | 3/19/2019 | | 3/28/2019 | | PASS |
Javier Guzman
|
|
|
Signed off in ePlan by Plumbing Dan Ediger
|
Routing - Addressing | 3/19/2019 | | 3/19/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/19/2019 | | 3/19/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - MECHANICAL | 3/19/2019 | | 3/19/2019 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 3/18/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 3/6/2019 | | FAIL |
Julie Romig
|
|
|
1. Design Review approval for the exterior modifications to the entrance door at Gridlines B and 2. Contact Andrea Tuning at atuning@cityofboise.org or ###-#### regarding this process.
2. Provide structural calculations verifying the roof can support the additional mechanical units and attachment detail.
|
Application received | | | 3/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 4 2019 10:27AM
|