Permit Information
Permit NumberBLD19-00665
StatusFinaled
Name FALASH & COMPANY INC
Site Address 250 E PARKCENTER BLVD
Project NameAlbertsons GO- Pharm office TI
Customer Number 
ePlanReviewYes
Description
(ALBERTSONS GO - PHARMACY OFFICES) Permit to remodel an existing 445 sq. ft. business space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of non-load bearing office walls and door, construction of interior non-bearing walls to create (3) offices. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully Fire Sprinkled and alarmed. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice7/10/20197/10/20198/12/2019 DONE
DetailsBrandon Shaw
mailed 8-13
Letter of compliance/Occupancy  7/15/2019 DONE
BLD-Final7/10/20197/10/20197/10/2019PPASS
DetailsBrandon Shaw
Greg Phone #: ###-####
DOC - Permit Finaled7/10/20197/10/20197/10/2019PPASS
DetailsBrandon Shaw
FIRE-Final Inspection7/10/20197/10/20197/10/2019PPASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete.

Greg Phone #: ###-####
BLD-Framing/Rough-in5/20/20195/20/20195/20/2019PPASS
DetailsJim Storey
Greg-would like 20 minutes heads up Phone #: ###-####
Inspection Record Card- Bld  5/3/2019 DONE
Issue PAID IN FULL permit  5/3/2019 DONE
Plan assigned to (M_H)3/6/2019 3/19/2019 DONE
DetailsMichael Hanson
03/19 #518 L2 ePlan. Plan check complete - pending floodplain review.
Routing - PLAN CHECK3/6/2019 3/19/2019 PASS
DetailsMichael Hanson
Routing PW Flood Plain3/12/2019 3/19/2019 PASS
DetailsJason C. Taylor
Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance (B.C.C. 11-08). No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
1st review completed  3/19/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  3/19/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  3/19/2019 DONE
MET JESSICA@FALASHCOMPANYINC.COM
Need
Revsied Value
GC Form
Routing PW Drainage3/12/2019 3/12/2019 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS3/6/2019 3/7/2019 PASS
DetailsMorgan Webb
Routing - Addressing3/6/2019 3/7/2019 PASS
DetailsDoug Chausow
Intake Approval  3/6/2019 PASS
DetailsMichael Hanson
Intake approval by Michael Hanson.
Application received  3/4/2019 DONE
Application submitted via PDS Online on Mar 4 2019 10:39AM