Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-00670
StatusIssued
Name MOUNTAIN CREEK BUILDERS INC
Site Address 5619 W CRUZEN ST
Project NameMainusch basement remodel
Customer Number 
ePlanReviewNo
Description
MODIFICATION - TURNING AN UPSTAIRS BEDROOM INTO THE MASTER BATH 3.13.19 **jab** Permit for a remodel, to include: Demo basement door and wall, temporary walls to support 1st floor until new 4x10 beam and 4x4 posts are constructed, new walls and doors in basement to create (2) new bedrooms with egress windows, new tub/shower going in existing half bath, remodel bedroom on 1st floor to create a new bathroom, new mechanical mini-splits for basement bedrooms and west side of existing 1st floor, new electrical and plumbing work. - All work per plans, notations, attachments, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **MDH** **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference6/14/20196/17/20196/17/2019ACANC
DetailsTell Riley
BLD-Energy code compliance6/13/20196/14/20196/14/2019APART
DetailsTell Riley
Brandon Phone #: ###-####//air seal complete.// insulate walls and call for re-inspection//
BLD-Energy code compliance6/6/20196/7/20196/7/2019APART
DetailsMike Jordan
Brandon Phone #: ###-####. Complete airseal pack and insulate.
BLD-Framing/Rough-in5/10/20195/13/20195/13/2019APASS
DetailsJim Sly
Ross Phone #: ###-####
Plan assigned to (JAB) Josh3/13/20193/13/20193/13/2019 PASS
DetailsJosh Bogle
Routing Walk-In (BLD)3/13/20193/13/20193/13/2019PDONE
DetailsJosh Bogle
Routing - PLAN CHECK3/13/2019 3/13/2019 PASS
DetailsJosh Bogle
Case Summary (BLD)  3/13/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  3/13/2019 DONE
CHANGE STATUS TO (ISS)  3/13/2019 DONE
Plan Modification Accepted  3/13/2019 DONE
bathroom remodel on top floor
Routing Walk-In (BLD)3/5/20193/5/20193/5/2019PDONE
DetailsJosh Bogle
Routing - PLAN CHECK3/5/2019 3/5/2019 PASS
DetailsJosh Bogle
HVAC to remain the same, no work to upstairs at this point
1st review completed  3/5/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  3/5/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  3/5/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  3/5/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  3/5/2019 DONE
Issue PAID IN FULL permit  3/5/2019 DONE
Routing Walk-In (Zoning)3/4/20193/4/20193/4/2019PPASS
DetailsKarla Nelson
Routing Walk-In (BLD)3/4/20193/4/20193/4/2019PFAIL
DetailsMichael Hanson
Applicant will bring back 1st floor plan and HVAC calc's for new mini splits being installed for new basement bedrooms and existing north half of 1st floor.
Application received 3/4/2019