BLD-Aging Inspection | 4/1/2020 | 4/1/2020 | 4/9/2020 | | PEND |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 4/2/2020 | 4/2/2020 | 4/7/2020 | | PEND |
Tell Riley
|
|
|
|
Plan Reviewer's activity | | | 11/20/2019 | | DONE |
Brian McGowan
|
|
|
Uploaded letter from CHCD that no inspection or review was needed for adding the remodeling the Bathrooms.
|
BLD-Final | 11/18/2019 | 11/19/2019 | 11/19/2019 | A | PASS |
Tell Riley
|
|
|
John Phone #: ###-####//final complete per plans//ok once CDHD has signed off//
|
FIRE-Final Inspection | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to re-install the panic hardware at the back entrance prior to the building inspection.
John-please call for access Phone #: ###-####
|
BLD-Framing/Rough-in | 10/4/2019 | 10/7/2019 | 10/7/2019 | A | PASS |
Tell Riley
|
|
|
call for access- John Phone #: ###-####//fire wall patch completed//trades rough ins passed//
|
BLD-Framing/Rough-in | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Tell Riley
|
|
|
call for access- 30 mins- John Phone #: ###-####//part for walls only//will need to see the repaired firewall--existing damage and needs grouted//need mechanical before ceiling is covered//
|
Meeting | | | 7/11/2019 | | DONE |
|
|
|
Home Town USA INC provided a signed contract (see attached document) that stated they are the new GC for this project. They filled out a 302 and 306 for their information.
Sent email to owner to confirm.
|
Inspection Record Card- Bld | | | 7/11/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/11/2019 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 3/8/2019 | 3/8/2019 | 4/8/2019 | | DONE |
Brian McGowan
|
|
|
1st Review Complete - 03/25 - Needs to Pass FIRE - Corrections Required - 03/13 (L1, #518) China Grand Buffet RR Remodel
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/8/2019 | | DONE |
|
|
|
all met:
Need GC
Need Rev cert of val
I left a voice mail with BJM asking if the sign off card needs CDHD sign off
|
Routing - FIRE | 3/20/2019 | 3/20/2019 | 4/2/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Review 04.02.2019.pdf uploaded.
|
Routing - PLAN CHECK | 3/28/2019 | | 3/28/2019 | | PASS |
Brian McGowan
|
|
|
|
Route to Impact Fee Review | 3/13/2019 | 3/16/2019 | 3/14/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 3/8/2019 | | 3/13/2019 | | FAIL |
Brian McGowan
|
|
|
Proposed wall to contain new plumbing is a rated, (2) hour wall made of CMU block as per BLD00-02304
|
1st review completed | | | 3/13/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - Addressing | 3/8/2019 | | 3/8/2019 | | PASS |
Doug Chausow
|
|
|
Address changed to 10498 W Fairview Ave
|
Routing - PUBLIC WORKS | 3/8/2019 | | 3/8/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 3/8/2019 | | 3/8/2019 | | PASS |
Daryl Spivey
|
|
|
Field verify restroom exhaust fans are minimum 210 CFM.
|
Intake Approval | | | 3/7/2019 | | PASS |
Michael Hanson
|
|
|
Prescreen approved by Michael Hanson.
|
Telephone call | | | 3/6/2019 | | DONE |
Michael Hanson
|
|
|
Discussed project with Bob Archibald, he deemed the plumbing work minor in nature OK for arch to stamp and sign no mechanical engeering required.
|
Application received | | | 3/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 4 2019 3:03PM
|