Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-00686
StatusFinaled
Name ETHOS DESIGN & REMODEL LLC
Site Address 2911 N MCKINNEY ST
Project NamePage egress
Customer Number 
ePlanReviewNo
Description
MODIFICATION - WINDOW WELLS NO LONGER PART OF THE ENGINEERING - WELLS TO BE CORRUGATED STEEL 3-29-19 **jab** Permit for a remodel, to include: adding two basement egress windows/wells and replacing a portion of bearing wall with a beam (cased opening). All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/21/20195/23/20195/23/2019PPASS
DetailsJim Sly
Kristen Phone #: ###-####- Please call for access
DOC - Permit Finaled5/23/20195/23/20195/23/2019PPASS
DetailsJim Sly
BLD-Framing/Rough-in4/10/20194/11/20194/11/2019APASS
DetailsJim Sly
Please call for access, Kristen Phone #: ###-####
BLD-Framing/Rough-in4/10/20194/11/20194/11/2019APASS
DetailsJim Sly
Kristen Phone #: ###-####
BLD-Conference4/4/20194/5/20194/5/2019APASS
DetailsJim Sly
Please call for access-Kristen Phone #: ###-####
Routing Walk-In (BLD)3/29/20193/29/20193/29/2019PDONE
DetailsJosh Bogle
Plan Modification Accepted  3/29/2019 DONE
Routing - PLAN CHECK3/29/2019 3/29/2019 PASS
DetailsJosh Bogle
Case Summary (BLD)  3/29/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  3/29/2019 DONE
DetailsJosh Bogle
no PR fee
Permit Ready to Issue  3/29/2019 DONE
CHANGE STATUS TO (ISS)  3/29/2019 DONE
Routing Walk-In (Zoning)3/5/20193/5/20193/5/2019ADONE
DetailsColleen T Carroll
Routing Walk-In (BLD)3/5/20193/5/20193/5/2019APASS
DetailsSue Cummings
Routing - PLAN CHECK3/5/2019 3/5/2019 PASS
DetailsJosh Bogle
1st review completed  3/5/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  3/5/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  3/5/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  3/5/2019 DONE
DetailsJosh Bogle
Issue PAID IN FULL permit  3/5/2019 DONE
Application received 3/5/2019