BLD-Foundation | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
BLD-Footing | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | PART |
Mike Jordan
|
|
|
Zach Phone #: ###-####. Needs to provide additional vert. to each column.
|
PubWorks Subgrade Approval | 7/15/2019 | 7/15/2019 | 7/15/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 5/1/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 3/20/2019 | | |
|
|
|
|
Plan assigned to (BJM) | 3/6/2019 | 3/6/2019 | 3/20/2019 | | DONE |
Brian McGowan
|
|
|
1st Review Completed - 03/19 (L2 sfd) Miller Deck in WUI, paper
|
Telephone call | | | 3/20/2019 | | DONE |
|
|
|
Left voice mail for Tim to inform him that permit is ready.
|
Routing - PLAN CHECK | 3/20/2019 | | 3/20/2019 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/20/2019 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/20/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/20/2019 | | DONE |
|
|
|
MET
|
Routing - PLAN CHECK | 3/6/2019 | | 3/19/2019 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 3/19/2019 | | FAIL |
Brian McGowan
|
|
|
Comliant (1) hour rated soffit design needed.
|
Routing - Erosion and Sediment | 3/6/2019 | | 3/8/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver request approved. Certified RP provided. Site preparation inspection is optional.
|
Routing Walk-In (Zoning) | 3/6/2019 | 3/6/2019 | 3/6/2019 | A | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 3/6/2019 | 3/6/2019 | 3/6/2019 | A | PASS |
Brian McGowan
|
|
|
Brian took this one
|
Routing - PUBLIC WORKS | 3/6/2019 | | 3/6/2019 | | PASS |
Morgan Webb
|
|
|
Needs HILSIDE Review
|
Routing PW Grading-Hillside | 3/6/2019 | | 3/6/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Application received | | 3/6/2019 | | | |
|
|
|
|