Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD19-00710
StatusFinaled
Name CLARK HOMES
Site Address 1315 N 6TH ST
Project NameClark Homes Remodel
Customer NumberDRH18-00453
ePlanReviewNo
Description
Permit for a Remodel to include kitchen area demo and remodel of kitchen. Relocation of windows, addition of Mudroom with new exterior door and new covered porch. All work per Architect stamped and signed plans, along with engineering, notes and local codes. Separate electrical, plumbing and mechanical permit required. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/30/20197/30/20197/30/2019PPASS
DetailsDave Hannah
Mark Phone #: ###-####
DOC - Permit Finaled7/30/20197/30/20197/30/2019PPASS
DetailsDave Hannah
BLD-Final7/24/20197/25/20197/25/2019APEND
DetailsDave Hannah
Call ahead for access // Mark Phone #: ###-#### needs smoke and co2 detectors up stairs
BLD-Energy code compliance4/18/20194/19/20194/19/2019PPASS
DetailsJim Sly
Mark Phone #: ###-####
BLD-Framing/Rough-in4/17/20194/18/20194/18/2019APASS
DetailsBrandon Shaw
OK to insulate...
Plan assigned to (RDP)3/12/20193/12/20193/19/2019 DONE
DetailsRob Patrick
03/12 Kitchen remodel/Exterior Windows...03/12 Failed
Routing - PLAN CHECK3/19/2019 3/19/2019 PASS
DetailsRob Patrick
Inspection Record Card- Bld  3/19/2019 DONE
DetailsRob Patrick
Case Summary (BLD)  3/19/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  3/19/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  3/19/2019 DONE
Telephone call  3/19/2019 DONE
called Mark-left message on phone-let him know the permit was ready
Permit Ready to Issue  3/19/2019 DONE
met
Issue PAID IN FULL permit  3/19/2019 DONE
Plan resubmittals received  3/18/2019 DONE
Three copies of sheets A1.0, A2.0, A3.0, A4.0, A5.0 and A6.0. Taken to Rob
Plan assigned to (JAB) Josh3/6/20193/6/20193/12/2019 DEFR
DetailsJosh Bogle
3/12 remodel, paper
Routing - PLAN CHECK3/12/2019 3/12/2019 FAIL
DetailsRob Patrick
1st review completed  3/12/2019 FAIL
DetailsRob Patrick
Multiple Corrections
Routing Walk-In (Zoning)3/6/20193/6/20193/6/2019PPASS
DetailsKayCee Babb
Per DRH18-00548, plans updated 3-6-19.
Routing Walk-In (BLD)3/6/20193/6/20193/6/2019PPASS
DetailsJosh Bogle
applicant couldn't wait - taken in as a Level two
Application received 3/6/2019