Permit Information
Permit NumberBLD19-00711
StatusIssued
Name FLYNNER PROPERTIES LLC
Site Address 2467 N HEAVENS WAY
Project NameRolph Residence
Customer Number 
ePlanReviewYes
Description
CAT II HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMETNS, CLASS "A" ROOF REQUIRED. SPECIAL INSPECTIONS REQUIRED. SPRINKLERS REQUIRED. REScheck provided to show Energy Compliance. Permit for the construction of a new 4574 sq. ft., two story with a partial basement (first story 3223 sq. ft., second story 299 sq. ft., below grade 1052 sq.) single family dwelling with 5 bedrooms, 5.5 bathrooms, approximately 881 sq. ft. of covered patio/porch and a 845 sq. ft. attached garage per the approved plans and any notations. Engineering has been provided. A-1 zoning and setbacks per planning. ***BJM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection. ***SPRINKLERS ARE REQUIRED*** LGM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall Bracing4/2/20204/6/20204/6/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Bob Fink
BLD-Foundation3/2/20203/2/20203/2/2020PPASS
DetailsBrandon Shaw
Work in progress...
Column, back patio/deck...
BLD-Concrete2/27/20202/28/20203/2/2020PNR
DetailsDave Hannah
Concrete wall rebar inspection. This is the last element of structural concrete on this project. Phone #: ###-#### Inspection requested via web by Bob Fink still working on rebar
BLD-Foundation1/7/20201/7/20201/7/2020APASS
DetailsBrandon Shaw
Work in progress...
BLD-Foundation1/6/20201/7/20201/7/2020ACANC
DetailsBrandon Shaw
Partial foundation inspection. Phone #: ###-#### Inspection requested via web by Bob Fink
BLD-Foundation12/20/201912/23/201912/23/2019PCANC
DetailsBrandon Shaw
BOB FINK CANCEL INSPECTION// Partial foundation inspection. Phone #: ###-#### >> Inspection requested via web by Bob Fink
BLD-Foundation12/15/201912/16/201912/16/2019PPASS
DetailsBrandon Shaw
Partial foundation inspection
Work in progress...
Frost protection is required...
BLD-Foundation12/13/201912/16/201912/15/2019ACANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Bob Fink Inspection cancelled from web by: Bob Fink
BLD-Foundation11/22/201911/25/201911/25/2019PPASS
DetailsBrandon Shaw
Frost protection is required...
BLD-Footing10/21/201910/22/201910/22/2019APASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval10/2/201910/2/201910/2/2019 DONE
DetailsMelissa Jannusch
*FOOTINGS, RETAINING WALL, SLAB* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  8/30/2019 DONE
Inspection Record Card- Bld  8/30/2019 DONE
OVERRIDE  7/25/2019  
Routing - FIRE7/25/20197/25/20197/25/2019 PASS
DetailsLee G Meredith
07/31-Rolph Residence resubmittal LGM

7/25/19 Revised index sheet states that an NFPA 13D sprinkler system will be provided.
Plan assigned to (BJM)3/15/20193/15/20197/25/2019 DONE
DetailsBrian McGowan
2nd Review Complete - 04/03 (L2 sfd) ePlan
Routing - PLAN CHECK7/25/2019 7/25/2019 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  7/25/2019 DONE
DetailsBrian McGowan
Permit Ready to Issue  7/25/2019 DONE
Routing - PLAN CHECK5/20/2019 5/20/2019 FAIL
DetailsBrian McGowan
Must Pass FIRE. Need roofing specifications
Routing - MECHANICAL5/8/2019 5/8/2019 PASS
DetailsChad Schwendiman
Routing - FIRE5/7/20195/7/20195/7/2019 FAIL
DetailsLee G Meredith
Document provided by SUEZ indicates that fire flow is inadequate. 2250 gpm is required but on 2000 gpm is available for a limited duration of 90 minutes. Resubmittal required.
Routing - PLANNING5/7/2019 5/7/2019 PASS
DetailsNicolette Womack
1st review completed  4/3/2019 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK3/15/2019 4/3/2019 FAIL
DetailsBrian McGowan
Routing PW Grading-Hillside3/15/2019 3/25/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.

Route to Impact Fee Review3/15/20193/18/20193/18/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - FIRE3/15/20193/15/20193/18/2019 FAIL
DetailsLee G Meredith
04/29 Rolph Residence Hillside.
SUEZ Fire Flow Availability report not provided. Access distance exceeds 150. Sprinklers may be required.
Routing - Erosion and Sediment3/15/2019 3/18/2019 PASS
DetailsMichael Zawacki
Foothills lot, site prep inspection required.
Routing - PLANNING3/15/2019 3/18/2019 PASS
DetailsNicolette Womack
Routing - Addressing3/15/2019 3/15/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/15/2019 3/15/2019 PASS
DetailsMorgan Webb
Routing - MECHANICAL3/15/2019 3/15/2019 FAIL
DetailsTroy James
See eplan for corrections
Plans ACCEPTED BY PLAN TECH  3/15/2019 DONE
Recd Pcfee & Taken To Pln CK  3/15/2019 DONE
Intake Approval  3/15/2019 PASS
Intake Approval  3/11/2019 FAIL
1. Please label A/C and Furnace locations.
2. Please provide HVAC equipment schedule (example brand of furnace information)
3. Please upload the most recent civil set for grading and drainage plans (ABCO Engineering dated January 22, 2019) prior to acceptance for building permit review MMJ ###-####
Application received  3/6/2019 DONE
Application submitted via PDS Online on Mar 6 2019 2:14PM
Expiration Notice8/14/20199/5/2019