BLD-Other | 7/17/2019 | 7/17/2019 | 7/17/2019 | A | PASS |
Mike Jordan
|
|
|
Exterior wall insulation inspection for cover Phone #: ###-#### Inspection requested via web by Rachael Moore
|
BLD-Framing/Rough-in | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rachael Moore
|
BLD-Conference | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rachael Moore Inspection cancelled from web by: Rachael Moore
|
BLD-Framing/Rough-in | 7/5/2019 | 7/8/2019 | 7/8/2019 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rachael Moore. Needs to complete airsealpackage.
|
BLD-Wall Bracing | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rachael Moore
|
BLD-Framing/Rough-in | 5/29/2019 | 5/31/2019 | 5/30/2019 | A | CANC |
Mike Jordan
|
|
|
Bracing/sheathing inspection Phone #: ###-#### >> Inspection requested via web by Rachael Moore Inspection cancelled from web by: Rachael Moore
|
CHANGE STATUS TO (ISS) | | | 5/8/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (RDP) | 4/26/2019 | 4/26/2019 | 5/7/2019 | | DONE |
Rob Patrick
|
|
|
05/02 Plan Mod...05/03 Failed
|
Routing - PLAN CHECK | 5/7/2019 | | 5/7/2019 | | FAIL |
Rob Patrick
|
|
|
Still 4 sheets not legible.
|
Routing - PLAN CHECK | 5/7/2019 | | 5/7/2019 | | PASS |
Rob Patrick
|
|
|
Please add 4 hours for review time and trouble shooting file upload.
|
Permit Ready to Issue | | | 5/7/2019 | | DONE |
|
|
|
Plan Mod Approved
|
Routing - PLANNING | 5/6/2019 | | 5/6/2019 | | PASS |
Sue Cummings
|
|
|
No ADU approval. New floor plan submitted. O.K. now
|
Routing - PLAN CHECK | 5/3/2019 | | 5/3/2019 | | FAIL |
Rob Patrick
|
|
|
Dwgs not readable
|
Routing - PLAN CHECK | 4/29/2019 | | 5/2/2019 | | FAIL |
Rob Patrick
|
|
|
Dwgs not readable
|
Routing - PLAN CHECK | 5/1/2019 | | 5/1/2019 | | FAIL |
Rob Patrick
|
|
|
Dwgs need to be uploaded in correct size.
|
Plan Modification Accepted | | | 4/26/2019 | | DONE |
|
|
|
plan mod started -changes will be wall heights-they will taller-sheets 2, 3 4 & 9-struc calcs
|
BLD-Foundation | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PASS |
Mike Jordan
|
|
|
Foundation wall inspection. Before 11AM please. Please call Dan at listed number. Phone #: ###-#### Inspection requested via web by Rachael Moore
|
Plan assigned to (RDP) | 3/26/2019 | 3/26/2019 | 4/1/2019 | | CANC |
Rob Patrick
|
|
|
plan mod workflow started to add tall walls to structure...03/26 Failed // 4/1/19 plan mod cancelled per Rachel Moore
|
MISC ACTIONS | | | 4/1/2019 | | |
|
|
|
Plan mod started on 3/26 cancelled by applicant Rachel Moore. They are going to build according to originally approved plans.
|
CHANGE STATUS TO (ISS) | | | 4/1/2019 | | DONE |
|
|
|
plan mod was cancelled
|
Meeting | | | 4/1/2019 | | DONE |
|
|
|
called Rachael to9 let know Tisha removed teh plan mod-per Rachael they are keeping the drawings the same as originally approved-she killed the work flow in e plan for Rob P and changed Tidemark status back to ISS. I called Rob to let him know it was all taken care of thanks to Tisha and I called Rachael to let her know everything was back to the way it was when it was originally approved
|
Plan Modification Accepted | | | 3/26/2019 | | DONE |
|
|
|
Plan mod workflow started to change structure to tall walls with engineering.
|
Routing - PLANNING | 3/26/2019 | | 3/26/2019 | | PASS |
Sue Cummings
|
|
|
Still good, and still no ADU unless approved
|
Routing - PLAN CHECK | 3/26/2019 | | 3/26/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
BLD-Footing | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PART |
Mike Jordan
|
|
|
Call Dan at listed number Phone #: ###-#### Inspection requested via web by Rachael Moore. Needs to provide 3 inch clearance for reinforcement. Contractor has taller chairs and will install them. Ok to place concrete after new chairs installed.
|
BLD-Footing | 3/21/2019 | 3/22/2019 | 3/21/2019 | P | CANC |
Mike Jordan
|
|
|
Please call Dan to schedule Phone #: ###-#### >> Inspection requested via web by Rachael Moore Inspection cancelled from web by: Rachael Moore
|
Plan assigned to (RDP) | 3/13/2019 | 3/13/2019 | 3/21/2019 | | DONE |
Rob Patrick
|
|
|
03/15 Garage ePlan...03/14 Failed: 03/21 Failed
|
Routing - PLAN CHECK | 3/21/2019 | | 3/21/2019 | | FAIL |
Rob Patrick
|
|
|
Cross Section Required
|
Routing - PLAN CHECK | 3/21/2019 | | 3/21/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 3/21/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/21/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/21/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/20/2019 | | 3/20/2019 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLANNING | 3/11/2019 | | 3/14/2019 | | PASS |
Karla Nelson
|
|
|
The pool house may not be converted to an Accessory Dwelling Unit (ADU) without applyihng for an ADU and receiving the proper approval and permit.
|
Routing - PLAN CHECK | 3/13/2019 | | 3/14/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
1st review completed | | | 3/14/2019 | | FAIL |
Rob Patrick
|
|
|
|
Plan assigned to (JAB) Josh | 3/11/2019 | 3/11/2019 | 3/13/2019 | | DEFR |
Josh Bogle
|
|
|
3/15 garage, ePlan
|
Plans ACCEPTED BY PLAN TECH | | | 3/11/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/11/2019 | | DONE |
|
|
|
no intake fees taken-406
|
Intake Approval | | | 3/11/2019 | | PASS |
|
|
|
|
Application received | | | 3/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 6 2019 3:56PM
|
Routing - PLANNING | 5/2/2019 | | | | FAIL |
|
|
|
Still connot read the drawings
|
Routing - PLANNING | 4/29/2019 | | | | FAIL |
|
|
|
Drawings are not readable. No ADU coversion w/o proper approvals
|