Third Notice | | 7/14/2020 | 8/11/2020 | | DONE |
|
|
|
mailed 8-14-2020 with first follow up
|
First Follow up | | | 8/11/2020 | | DONE |
|
|
|
|
Third Notice | | 5/12/2020 | 7/9/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
Third Notice | | 4/8/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
Second Notice | | 3/15/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
First Notice | | 2/10/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
BLD-Final | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. All issues resolved. Ok for perm occ.
|
Permanent Occupancy | | | 1/31/2020 | | DONE |
|
|
|
|
Zoning Approval | 1/29/2020 | 1/29/2020 | 1/29/2020 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Final | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PART |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Ok for temp occ.
|
Temporary Occupancy | 1/23/2020 | 4/22/2020 | 1/23/2020 | | DONE |
Gemma Flores
|
|
|
|
PubWorks Occupancy Approval | 1/23/2020 | 1/23/2020 | 1/23/2020 | | DONE |
Tiffany Lowery
|
|
|
|
Print Occupancy Form | | | 1/23/2020 | | DONE |
|
|
|
|
BLD-Final | 1/21/2020 | 1/22/2020 | 1/22/2020 | P | PEND |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Needs to provide panic hardware on egress doors from mech/elec room. Outstanding plumbing permit as well.
|
FIRE-Final Inspection | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Building inspector is going to follow up on door hardware.
Tom Phone #: ###-####
|
BLD-Conference | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | DONE |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Noted issues with approved city plans on site, they do not appear to be the most current set with addtional redlines on sheets A1.0 and A6.0. Noted door hardware issues from mech room area for egress. Egress doors to have panic hardware. Doors from the mech. room to the wash tunnel need to have the sticker placed stating these doors to remain unlocked while building is occupied.
|
Zoning Approval Temp | 1/15/2020 | 1/15/2020 | 1/15/2020 | | PASS |
Katelyn Menuge
|
|
|
Temporary Approval - BND20-00016
|
BLD-Ceiling Grid Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PASS |
Mike Jordan
|
|
|
TOM Phone #: ###-####
|
Plan assigned to (JG) | 11/4/2019 | 11/4/2019 | 11/12/2019 | | PASS |
Javier Guzman
|
|
|
Plan Mod Bluebird Car Wash ePlan
|
Routing - PLAN CHECK | 11/12/2019 | | 11/12/2019 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 11/12/2019 | | DONE |
|
|
|
PLAN MOD Do not reissue
|
CHANGE STATUS TO (ISS) | | | 11/12/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/4/2019 | | DONE |
|
|
|
revise one line diagra for electrical equipment
|
BLD-Framing/Rough-in | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### ok to cover exteroior wall framing.
|
BLD-Wall Bracing | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PART |
Dave Hannah
|
|
|
Tom Phone #: ###-#### furred out ext wall south side east end ok to cover restroom and office ok to cover dog houses bocking and rat runs in ok to cover ext
|
BLD-Other | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Mike Jordan
|
|
|
TOM- ROOFING NAILING Phone #: ###-####
|
OVERRIDE | | | 9/24/2019 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/24/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/24/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (JG) | 9/19/2019 | 9/19/2019 | 9/23/2019 | | PASS |
Javier Guzman
|
|
|
9/26 Plan Mod Bluebird Car Wash ePlan
|
Routing - PUBLIC WORKS | 9/20/2019 | | 9/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Sewer Design | 9/23/2019 | | 9/23/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - PLAN CHECK | 9/20/2019 | | 9/20/2019 | | PASS |
Javier Guzman
|
|
|
|
Plan Modification Accepted | | | 9/19/2019 | | DONE |
|
|
|
plan mod #2- Revised the sewer service form the manhole in the street to the subject property
|
FIRE-Conference | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | DONE |
Troy Cobbley
|
|
|
We discussed the placement of the building address. Knox key box is not required. Tom Phone #: ###-####
|
BLD-Other | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | DEFR |
Mike Jordan
|
|
|
grout pour at 1:30 // Tom Phone #: ###-####
|
BLD-Other | 9/13/2019 | 9/16/2019 | 9/16/2019 | P | DEFR |
Mike Jordan
|
|
|
pour is at 2pm // grout insp.// Tom Phone #: ###-####. Special inspector on site.
|
BLD-Other | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | DEFR |
Mike Jordan
|
|
|
grout pour at 12- Tom Phone #: ###-####
|
BLD-Other | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | DEFR |
Mike Jordan
|
|
|
Tom-grout pour-pour time 2:00 Phone #: ###-####
|
BLD-Other | 9/5/2019 | 9/6/2019 | 9/6/2019 | P | DEFR |
Mike Jordan
|
|
|
grout at 2pm // Tom Phone #: ###-####
|
BLD-Other | 9/3/2019 | 9/4/2019 | 9/5/2019 | P | DEFR |
Mike Jordan
|
|
|
grout pour at 2 pm // Tom Phone #: ###-####
|
BLD-Other | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PART |
Mike Jordan
|
|
|
grout // Tom Phone #: ###-####. Work in progress. Will grout south east portion.
|
BLD-Other | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | DEFR |
Mike Jordan
|
|
|
Tom- massonary wall Phone #: ###-####. Ok to grout pending special inspection approval.
|
BLD-Other | 8/23/2019 | 8/26/2019 | 8/26/2019 | A | PART |
Mike Jordan
|
|
|
masonary - Tom Phone #: ###-####.Work in progress Top of foundation to 4ft. elevation. South wall and north interior wall. Ok to grout walls pending special inspection approval.
|
BLD-Foundation | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PART |
Mike Jordan
|
|
|
Thomas Phone #: ###-####. Conveyor trench walls, work in progress. Will have special inspection.
|
CHANGE STATUS TO (ISS) | | | 7/31/2019 | | DONE |
|
|
|
plan mod change to ISS
|
OVERRIDE | | | 7/29/2019 | | |
|
|
|
|
Plan assigned to (JG) | 6/27/2019 | 6/27/2019 | 7/29/2019 | | PASS |
Javier Guzman
|
|
|
2nd rev comp, Plan Mod Bluebird Car Wash ePlan
|
Routing - Design Review | 7/25/2019 | | 7/29/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 7/25/2019 | | 7/29/2019 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 7/29/2019 | | DONE |
|
|
|
PLAN MOD
|
BLD-Foundation | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. South exterior stemwall, conveyor pit floor.
|
BLD-Foundation | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Mike Jordan
|
|
|
wall // Tom Phone #: ###-####. Stemwalls on grids a and b.
|
Routing Off Site - STRUCTURAL | 7/10/2019 | | 7/16/2019 | | PASS |
Javier Guzman
|
|
|
signed of in ePlan by AHJ Engineers Chris Holladay
|
Routing - FIRE | 7/10/2019 | 7/10/2019 | 7/15/2019 | | PASS |
Mark Scharfen
|
|
|
07.15.2019-Reviewed plan mod. Uploaded rev_fire 07.15.2019.pdf.
|
Routing - PLAN CHECK | 7/10/2019 | | 7/13/2019 | | FAIL |
Javier Guzman
|
|
|
|
BLD-Footing | 7/10/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Mike Jordan
|
|
|
Tom- Phone #: ###-####. Exterior perimeter footings adn interior footings.
|
Routing - Design Review | 7/10/2019 | | 7/11/2019 | | FAIL |
Katelyn Menuge
|
|
|
Need accessible path to mat washers.
|
Routing - PUBLIC WORKS | 7/10/2019 | | 7/10/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing PW Drainage | 7/10/2019 | | 7/10/2019 | | PASS |
Brian Murphy
|
|
|
|
Plan Reviewer's activity | | | 7/2/2019 | | DONE |
Javier Guzman
|
|
|
Prescreen failed 7/2/19 due to the following
Provide and upload the following:
• Revise cover sheet index for new added plan sheets
• Engineering Calculations for the new POS canopy islands that are stamped, signed and dated by an Idaho licensed engineer
|
Plan Modification Accepted | | | 6/27/2019 | | DONE |
|
|
|
plan mod-there will be added valuations-changes to include canopies at the point of sale islands, upgarding ele serv to meet equip. needs, eleting emergency vehicle access road-sheets being modified are C1.0, C4.0, SP1.0, SP1.1, A7.3, S1.0, E1.0, E2.0, E4.0, E5.0, E6.0 & E7.0-assigned to JG
|
Issue PAID IN FULL permit | | | 6/13/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/13/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/13/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/12/2019 | | |
|
|
|
|
Plan assigned to (JG) | 3/19/2019 | 3/21/2019 | 6/12/2019 | | PASS |
Javier Guzman
|
|
|
2nd rev comp, 04/23 (6wks) - 502 Bluebird Carwash
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/12/2019 | | DONE |
|
|
|
all met-
Need GC
Need Rev Val
|
Routing - PLAN CHECK | 6/7/2019 | | 6/12/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 6/7/2019 | 6/7/2019 | 6/11/2019 | | PASS |
Mark Scharfen
|
|
|
06.11.2019-Completed fire review. HMIS updated-uploaded rev_fire 06.11.2019.pdf. Passed review.
|
Routing - PLANNING | 6/7/2019 | | 6/11/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing PW Street Lights | 6/7/2019 | | 6/7/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing - Design Review | 6/7/2019 | | 6/7/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 5/20/2019 | 5/20/2019 | 6/3/2019 | | FAIL |
Mark Scharfen
|
|
|
06.03.2019-completed fire review. uploaded rev_fire 06.03.2019.pdf and emailed architecht.
|
Routing - PLAN CHECK | 5/20/2019 | | 5/31/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 5/20/2019 | | 5/22/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Street Lights | 5/20/2019 | | 5/21/2019 | | FAIL |
Tom Marshall
|
|
|
Sheet E1.0 missing.
|
Routing PW Sewer Design | 5/20/2019 | | 5/20/2019 | | PASS |
DeAnn Brown
|
|
|
Proof of private sewer easement agreement will be required prior to issuance of sewer tap permit.
|
Route to Impact Fee Review | 4/27/2019 | 4/30/2019 | 4/29/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 4/27/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 3/19/2019 | 3/21/2019 | 4/26/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC review complete. IFC 1st review 04.26.2019.pdf uploaded and emailed to architecht.
|
Routing - PLAN CHECK | 3/21/2019 | | 4/24/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 3/21/2019 | | 4/20/2019 | | PASS |
Javier Guzman
|
|
|
signed of in ePlan by AHJ Engineers Chris Holladay
|
Routing PW Drainage | 3/21/2019 | | 4/2/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 3/21/2019 | | 3/28/2019 | | FAIL |
DeAnn Brown
|
|
|
See changemarks on sheet C2.0
|
Routing - MECHANICAL | 3/21/2019 | | 3/28/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Street Lights | 3/21/2019 | | 3/26/2019 | | FAIL |
Tom Marshall
|
|
|
Need to add street light on the NEC of Bird & Overland.
|
Routing PW Environmental | 3/21/2019 | | 3/25/2019 | | PASS |
Terry Alber
|
|
|
All bulk chemicals shall have secondary containment, or drains in equipment room shall have plugs.
|
Routing PW Solid Waste | 3/21/2019 | | 3/21/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLUMBING | 3/21/2019 | | 3/21/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 3/21/2019 | | 3/21/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 3/21/2019 | | 3/21/2019 | | PASS |
Doug Chausow
|
|
|
Updated parcel number
|
Routing - PUBLIC WORKS | 3/21/2019 | | 3/21/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 3/21/2019 | | 3/21/2019 | | PASS |
Michael Zawacki
|
|
|
Valid RP required before issuance of permit.
Site prep inspection mandatory.
|
Routing - Design Review | 3/21/2019 | | 3/21/2019 | | FAIL |
Andrea Tuning
|
|
|
Eliminate the existing property line located in the middle of the parcel or complete a property line adjustment.
Remove vacuum producer and mat washers from the planter islands and install a large Class II tree.
Remove the pole lighting, pole signage and pay stations from within teh required setback near the east property line.
Remove pole light from setback on Bird Street.
Remove vacuum producer and mat washers from the planter islands and install a large Class II tree.
Remove the Columnar Norway Maple trees from the interior planter islands and install large canopy Class II tree.
Remove the Easy Street Maple trees and replace them with a large canopy Class II tree.
|
Intake Approval | | | 3/19/2019 | | PASS |
Michael Hanson
|
|
|
Prescreen approved/fees paid 3/19/19.
|
Application received | | | 3/7/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 7 2019 2:48PM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|