Second Notice | | 9/29/2019 | 9/26/2019 | | DONE |
|
|
|
This permit finaled on the web by Michele Rodgers
|
First Notice | 8/27/2019 | 8/27/2019 | 9/19/2019 | | DONE |
Brandon Shaw
|
|
|
mailed 9-20-19
|
BLD-Final | 8/26/2019 | 8/27/2019 | 8/27/2019 | P | PASS |
Brandon Shaw
|
|
|
Call ahead 15 minutes // TOM Phone #: ###-####
|
DOC - Permit Finaled | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, fire sprinkler ispections are complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete.
TOM Phone #: ###-####
|
FIRE-Final Inspection | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | FAIL |
Jim Page
|
|
|
FIR permits (2 permits for this project) for fire sprinkler work have not been inspected or finaled, life fire safety inspection will not be signed off until fire sprinkler permits are finaled.
Tom Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Tony Young
|
|
|
ceiling over beer // Tom Phone #: ###-####
|
BLD-Other | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | PART |
Tony Young
|
|
|
t bar // Tom Phone #: ###-####,, west cart storage area,, ok after trades
|
BLD-Footing | 5/3/2019 | 5/6/2019 | 5/6/2019 | A | PART |
Brandon Shaw
|
|
|
Tom-car stoarge Pending Special inspection...
|
BLD-Framing/Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Brandon Shaw
|
|
|
Tom Phone #: ###-####
|
BLD-Footing | 5/2/2019 | 5/3/2019 | 5/3/2019 | P | CANC |
Tony Young
|
|
|
Tom Phone #: ###-#### canel per Tom
|
BLD-Footing | 4/22/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Jim Sly
|
|
|
Tom Phone #: ###-#### Cart storage .....West side.
|
BLD-Framing/Rough-in | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PART |
Tony Young
|
|
|
Tom Phone #: ###-####,, immunization room extension ok
|
BLD-Framing/Rough-in | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | PART |
Tony Young
|
|
|
Austin Phone #: ###-####,, flower cooler area walls ok
|
BLD-Framing/Rough-in | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | NR |
Brandon Shaw
|
|
|
All trades need to aquire permits...
|
Issue PAID IN FULL permit | | | 4/11/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/11/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/11/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/10/2019 | | 4/10/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 4/10/2019 | | DONE |
|
|
|
met-Need GC
met-Need Rev Val
|
Plan assigned to (M_H) | 3/20/2019 | | 4/10/2019 | | DONE |
Michael Hanson
|
|
|
1st review completed - 04/02 #518 L2 ePlan
|
Route to Impact Fee Review | 4/1/2019 | 4/4/2019 | 4/2/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 3/20/2019 | 3/20/2019 | 4/1/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Review 04.01.2019.pdf uploaded. Passed.
|
1st review completed | | | 4/1/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 3/20/2019 | | 3/29/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Routing - MECHANICAL | 3/20/2019 | | 3/26/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLUMBING | 3/20/2019 | | 3/21/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 3/20/2019 | | 3/21/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Addressing | 3/20/2019 | | 3/21/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - Design Review | 3/20/2019 | | 3/21/2019 | | PASS |
Katelyn Menuge
|
|
|
CZC19-00059
|
Intake Approval | | | 3/20/2019 | | PASS |
Joe Bruce
|
|
|
Plans approved by Joe Bruce.
|
Intake Approval | | | 3/14/2019 | | FAIL |
Joe Bruce
|
|
|
Please provide the following to complete your prescreen:
1) Planning and Zoning letters of approval are required for the additional rooftop mounted air cooled condenser equipment being added for this project. Please contact Katelyn Menuge at ###-#### kmenuge@cityofboise.org - Design Review for more information on the application requirements for this project. The zoning approval certificate will be required prior to intake approval.
2) All drawings are required to be stamped and signed by and Idaho Licensed Engineer. Please provide a stamp/signature/date on the Refrigeration "R" drawings. No stamp was provided on these drawings.
3) Special Inspections are required for the field welding shown on the structural drawings. Please note the special inspections on the plans and have the engineer and owner fill out and sign Form #310 Statement of Special Inspections reflecting the required special inspections for this project. Upload this document into the documents folder.
4) Provide locations of fire extinguishers on the floor plan for both new and existing extinguishers.
5) Provide cut sheets or details on the plans showing accessibility of new check stands.
|
Application received | | | 3/9/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 9 2019 11:43AM
|