BLD-Final | 2/4/2020 | 2/4/2020 | 2/5/2020 | P | DONE |
Tony Young
|
|
|
Andy; Phone #: ###-####
|
DOC - Permit Finaled | 2/5/2020 | 2/5/2020 | 2/5/2020 | P | PASS |
Tony Young
|
|
|
|
Zoning Approval | 2/5/2020 | 2/5/2020 | 2/5/2020 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Final | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | PEND |
Dave Hannah
|
|
|
call for access Andy Phone #: ###-#### still waiting on zoning
|
BLD-Final | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PEND |
Tony Young
|
|
|
call for access Andy Phone #: ###-####// ok pending historical/zoning
|
BLD-Energy code compliance | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Tony Young
|
|
|
Andy- please call 30 min before for access Phone #: ###-####
|
BLD-Framing/Rough-in | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Tony Young
|
|
|
call 30 minutes ahead // Andy Phone #: ###-####
|
Change Expiration Date Only | | | 9/27/2019 | | DONE |
|
|
|
Permit accidentially reissued on 9/26/19
|
Routing Walk-In (BLD) | 9/25/2019 | 9/25/2019 | 9/26/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/26/2019 | | 9/26/2019 | | PASS |
Josh Bogle
|
|
|
ONE HOUR PLAN REVIEW FEE
|
Case Summary (BLD) | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/26/2019 | | DONE |
|
|
|
plan mod
|
Telephone call | | | 9/26/2019 | | DONE |
|
|
|
spoke with andy informing him that the plan mod is completed and the fee amount due
|
CHANGE STATUS TO (ISS) | | | 9/26/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/13/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Josh Bogle
|
|
|
discussion about submitting plans for plan mod
|
BLD-Wall Bracing | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PEND |
Brandon Shaw
|
|
|
Need to submit revised plans for as built, exterior door removed, windows removed and/or moved, fireplace moved to South East corner...
|
Issue PAID IN FULL permit | | | 6/28/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/28/2019 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 6/28/2019 | | DONE |
|
|
|
Permit accidentially reissued on 9/26/19
|
Routing Walk-In (Zoning) | 6/24/2019 | 6/24/2019 | 6/24/2019 | A | PASS |
KayCee Babb
|
|
|
Per plans modified in DRH18-00443 on 3-11-19.
|
Routing Walk-In (BLD) | 6/24/2019 | 6/24/2019 | 6/24/2019 | A | FAIL |
Josh Bogle
|
|
|
waiting on engineering - took in
|
Plan assigned to (JAB) Josh | 3/11/2019 | 3/11/2019 | 6/24/2019 | | PASS |
Josh Bogle
|
|
|
3/15 remodel, paper - 1st done
|
Routing - PLAN CHECK | 6/24/2019 | | 6/24/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/24/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/24/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 6/24/2019 | | DONE |
|
|
|
Called to let them know their permit is ready and informed them of fees
|
Routing - PLAN CHECK | 3/13/2019 | | 3/13/2019 | | FAIL |
Josh Bogle
|
|
|
need a roof plan & a section view
|
1st review completed | | | 3/13/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
KayCee Babb
|
|
|
Associated with roof pitch alteration only. XREF BLD18-00626
|
Routing Walk-In (BLD) | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level two review
|
Application received | | 3/11/2019 | | | |
|
|
|
|