BLD-Energy code compliance | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PASS |
Tell Riley
|
|
|
early am // David Phone #: ###-####//fix cut joist under shower pan//
|
BLD-Framing/Rough-in | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Tell Riley
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 7/26/2019 | 7/29/2019 | 7/29/2019 | P | NR |
Tell Riley
|
|
|
David Phone #: ###-####//need plumbing,mechanical and electrical rough inspections//
|
BLD-Framing/Rough-in | 7/12/2019 | 7/22/2019 | 7/22/2019 | A | CANC |
Tell Riley
|
|
|
THIS WAS CANCEL THE MORNING OF Jim Phone #: ###-####
|
BLD-Wall Bracing | 7/19/2019 | 7/19/2019 | 7/19/2019 | P | PASS |
Tell Riley
|
|
|
David Phone #: ###-####//shear corrections made//ok to continue//
|
BLD-Wall Bracing | 7/16/2019 | 7/18/2019 | 7/18/2019 | P | NR |
Tell Riley
|
|
|
Dave Phone #: ###-####//add sblocking at braced locations as on plans//
|
BLD-Foundation | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Tell Riley
|
|
|
David Phone #: ###-####//setbacks ok// wall rebar installed// vents installed//
|
BLD-Footing | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Tell Riley
|
|
|
Jim Phone #: ###-####//surveyed point installed. setbacks meet requirements per plans//
|
BLD-Footing | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PART |
Tell Riley
|
|
|
as early as possible // Jim Phone #: ###-####//setbacks, getting surveyed point installed prior to wall inspection.// rebar installed in footings// work in progress.//
|
BLD-Footing | 6/11/2019 | 6/12/2019 | 6/12/2019 | P | NR |
Tell Riley
|
|
|
Jim Phone #: ###-####//need to establish property line to measure correct setbacks for additon.//call for re-inspection.//
|
OVERRIDE | | | 6/11/2019 | | |
|
|
|
|
Telephone call | | | 6/11/2019 | | DONE |
|
|
|
Left voicemail for David to inform him the permit is ready and what fees are due.
|
Issue PAID IN FULL permit | | | 6/11/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/11/2019 | | DONE |
|
|
|
Met
|
Plan assigned to (JAB) Josh | 6/6/2019 | 6/6/2019 | 6/10/2019 | | PASS |
Josh Bogle
|
|
|
6/7 addition, paper
|
1st review completed | | | 6/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/10/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Routing - MECHANICAL | 6/6/2019 | | 6/10/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 6/10/2019 | | 6/10/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Josh Bogle
|
|
|
took in and routed
|
Routing Walk-In (BLD) | 3/13/2019 | 3/13/2019 | 3/13/2019 | A | FAIL |
Brian McGowan
|
|
|
Need Manual J
|
Routing - PLAN CHECK | 3/13/2019 | | 3/13/2019 | | FAIL |
Brian McGowan
|
|
|
Need Manual J for new Furn.
|
Routing Walk-In (Zoning) | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
KayCee Babb
|
|
|
|
Routing Walk-In (BLD) | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/11/2019 | | 3/11/2019 | | FAIL |
Josh Bogle
|
|
|
plans per 2012 code - lacked some minor details
|
1st review completed | | | 3/11/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 3/11/2019 | | | |
|
|
|
|