BLD-Final | 7/10/2020 | 7/10/2020 | 7/10/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Sabrina McCleve
|
DOC - Permit Finaled | 7/10/2020 | 7/10/2020 | 7/10/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 7/6/2020 | 7/8/2020 | 7/7/2020 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sabrina McCleve Inspection cancelled from web by: Sabrina McCleve
|
BLD-Final | 7/3/2020 | 7/6/2020 | 7/6/2020 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sabrina McCleve Inspection cancelled from web by: Sabrina McCleve
|
BLD-Framing/Rough-in | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Brandon Shaw
|
|
|
Sabrina *screened* (if picture inspection being requested) Virtual inspection due to Covid-10...
|
BLD-Energy code compliance | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Sabrina McCleve
|
BLD-Framing/Rough-in | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Sabrina McCleve
|
BLD-Wall Bracing | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to cover exterior...
|
BLD-Conference | 9/23/2019 | 9/24/2019 | 9/24/2019 | P | DONE |
Brandon Shaw
|
|
|
Pre framing walk thru...
|
BLD-Aging Inspection | 8/20/2019 | 8/20/2019 | 8/20/2019 | | DONE |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | DEFR |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | CANC |
Jim Storey
|
|
|
Shauw- please call 30 min before thanks Phone #: ###-#### wrong # bld
|
BLD-Foundation | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PASS |
Jim Storey
|
|
|
Ring doorbell. Permit and plans will be in shed if no one is home. Phone #: ###-#### Inspection requested via web by Sabrina McCleve
|
BLD-Footing | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Sabrina McCleve
|
OVERRIDE | | | 3/20/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 3/19/2019 | 3/19/2019 | 3/20/2019 | | DONE |
Jenny Nelson
|
|
|
03/20 addition eplan
|
1st review completed | | | 3/20/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2019 | | DONE |
Jenny Nelson
|
|
|
ESC yes, Energy yes
|
Permit Ready to Issue | | | 3/20/2019 | | DONE |
|
|
|
met
(if parcel owner is not GC & RP we'll need GC form and RP)
|
Issue PAID IN FULL permit | | | 3/20/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/14/2019 | | 3/20/2019 | | PASS |
Jenny Nelson
|
|
|
|
Plan assigned to (JAB) Josh | 3/14/2019 | 3/14/2019 | 3/19/2019 | | DEFR |
Josh Bogle
|
|
|
3/20 addition, ePlan
|
Intake Approval | | | 3/14/2019 | | FAIL |
|
|
|
Please upload all drawings individually and make sure they face the correct way-forgot to put in the note to name the drawings correctly so i called Sabrina
|
Intake Approval | | | 3/14/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/14/2019 | | DONE |
|
|
|
no fees paid at intake
|
Routing - PLANNING | 3/14/2019 | | 3/14/2019 | | PASS |
Sue Cummings
|
|
|
|
Application received | | | 3/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 12 2019 12:39PM
|