BLD-Framing/Rough-in | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Jim Storey
|
|
|
Ed Phone #: ###-#### c/n made ok
|
BLD-Energy code compliance | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Jim Storey
|
|
|
Ed Phone #: ###-####
|
BLD-Framing/Rough-in | 7/17/2019 | 7/18/2019 | 7/18/2019 | P | FAIL |
Jim Storey
|
|
|
ed Phone #: ###-#### need old roof load transphered to new girder.
|
BLD-Other | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Dave Hannah
|
|
|
stem wall // Ed Phone #: ###-####
|
BLD-Footing | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
BLD-Footing | 5/13/2019 | 5/14/2019 | 5/14/2019 | P | FAIL |
Brandon Shaw
|
|
|
No permit, no city approved plans on site...
|
OVERRIDE | | | 4/18/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/18/2019 | 4/18/2019 | 4/18/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/18/2019 | | 4/18/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/18/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 4/18/2019 | | DONE |
|
|
|
-Met
gave Sara from Strite Design the ESC card but homeowner will be in to pay and sign for permit as well as they need the GC form
|
Telephone call | | | 4/18/2019 | | DONE |
|
|
|
didn't call customer because Sara from Strite Design came in and she will let the homeowner know the fees due and that they need to fill out a GC form
|
Issue PAID IN FULL permit | | | 4/18/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/16/2019 | 4/16/2019 | 4/16/2019 | A | PASS |
KayCee Babb
|
|
|
DRH19-00106
|
Routing Walk-In (BLD) | 4/16/2019 | 4/16/2019 | 4/16/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/16/2019 | | 4/16/2019 | | FAIL |
Josh Bogle
|
|
|
Needs: attic ventilation plan, ES report, egress window, smokies, handrail details
|
1st review completed | | | 4/16/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | FAIL |
Colleen T Carroll
|
|
|
will need a Certificate of Appropriatness
|
Application received | | 3/12/2019 | | | |
|
|
|
|