BLD-Final | 2/20/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Dave Hannah
|
|
|
Ren Phone #: ###-####
|
DOC - Permit Finaled | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/13/2020 | 2/13/2020 | 2/19/2020 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/12/2020 | 2/12/2020 | 2/19/2020 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | DONE |
Dave Hannah
|
|
|
Ren Phone #: ###-####
|
BLD-Framing/Rough-in | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Dave Hannah
|
|
|
Ren Phone #: ###-####
|
BLD-Energy code compliance | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | PART |
Dave Hannah
|
|
|
Ren Phone #: ###-#### air seal ok
|
BLD-Footing | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Dave Hannah
|
|
|
before 2:30 // Ren Phone #: ###-####
|
BLD-Wall Bracing | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Dave Hannah
|
|
|
REN Phone #: ###-####
|
BLD-Foundation | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Wall Bracing | 6/13/2019 | 6/13/2019 | 6/14/2019 | P | NR |
Dave Hannah
|
|
|
stem wall // Ren Phone #: ###-####
|
BLD-Footing | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Dave Hannah
|
|
|
trying to pour at 1:15 // Ren Phone #: ###-####
|
BLD-Wall Bracing | 5/10/2019 | 5/13/2019 | 5/13/2019 | P | CANC |
Dave Hannah
|
|
|
stem wall // Ren Phone #: ###-####
|
BLD-Foundation | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | PASS |
Dave Hannah
|
|
|
basement walls
|
BLD-Footing | 5/1/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Dave Hannah
|
|
|
Ren Phone #: ###-####
|
BLD-Footing | 4/26/2019 | 4/29/2019 | 4/29/2019 | A | PASS |
Dave Hannah
|
|
|
Ren Phone #: ###-####
|
Inspection Record Card- Bld | | | 4/5/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/5/2019 | | DONE |
|
|
|
|
Telephone call | | | 4/4/2019 | | DONE |
|
|
|
emailed JON@KINGBUILTIDAHO.COM that all fees were not paid asked them to let us know when paid so we can print permits out for them and once signed we can sign off on the approved drawings
|
OVERRIDE | | | 4/3/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 3/14/2019 | 3/14/2019 | 4/3/2019 | | DONE |
Rob Patrick
|
|
|
04/02 Duplex L2 ePlan...03/28 Failed
|
Routing - PLANNING | 4/3/2019 | | 4/3/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 4/3/2019 | | 4/3/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/3/2019 | | DONE |
|
|
|
MET-(fees added)
Waiting to hear back from Karina about PRK not having fees
|
1st review completed | | | 3/28/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections req'd
|
Routing - PLAN CHECK | 3/14/2019 | | 3/28/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections req'd
|
Route to Impact Fee Review | 3/14/2019 | 3/17/2019 | 3/15/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 3/14/2019 | | 3/15/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 3/14/2019 | | 3/15/2019 | | FAIL |
Katelyn Menuge
|
|
|
See changemark and submit approval from Idaho Power approving clearance from overhead utilities.
|
Routing - Addressing | 3/14/2019 | | 3/14/2019 | | PASS |
Doug Chausow
|
|
|
2113 and 2115 W Bannock St
|
Routing - PUBLIC WORKS | 3/14/2019 | | 3/14/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 3/14/2019 | | FAIL |
|
|
|
The new drawings you uploaded are 11x8 sheet size and we need all drawings to be 24x18 or larger. Please re-upload: Cover Sheet, L-01 Site, A-04 2nd floor plan, A-03 1st floor plan and A-02 Basement floor plan and resubmit.
|
Plans ACCEPTED BY PLAN TECH | | | 3/14/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/14/2019 | | DONE |
|
|
|
|
Intake Approval | | | 3/14/2019 | | PASS |
|
|
|
|
Intake Approval | | | 3/13/2019 | | FAIL |
|
|
|
emailed applicant to inform them the drawing file names are incorrect and that we have deleted all drawings and for them to reupload with the correct file names.
|
Intake Approval | | | 3/13/2019 | | FAIL |
|
|
|
2nd Prescreen: Cover sheet states that you are using 2012 IRC code year. We are in the 2015 IRC code year, please update your cover sheet and any plans that state 2012 IRC to the 2015 IRC year and resubmit.
|
Application received | | | 3/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 12 2019 4:40PM
|