Third Notice | | 10/30/2019 | 11/27/2019 | | DONE |
|
|
|
mailed 12-2-19 with first follow up
|
First Follow up | | | 11/27/2019 | | DONE |
|
|
|
|
Third Notice | | 9/23/2019 | 10/25/2019 | | DONE |
|
|
|
mailed 11-1-19
|
Third Notice | | 8/10/2019 | 9/18/2019 | | DONE |
|
|
|
mailed 9-19-19
|
Second Notice | | 7/20/2019 | 8/5/2019 | | DONE |
|
|
|
mailed 8-5-2019
|
First Notice | | 6/22/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11
|
BLD-Final | 6/7/2019 | 6/10/2019 | 6/12/2019 | A | DONE |
Dave Hannah
|
|
|
call ahead for lock box code // Clint Phone #: ###-####
|
BLD-Final | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Dave Hannah
|
|
|
call for access // clint Phone #: ###-####
|
Permanent Occupancy | | | 6/12/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/7/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Jim Page
|
|
|
Addressing has been adjusted, address for this tenant space is now 118 instead of 122, final life fire safety inspection complete.
|
FIRE-Final Inspection | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PART |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag. Permit will be partially finaled for life safety pending addressing issue being resloved. As of this entry there are 2 tenant spaces in the building with the same address of 122 5th.
CLENT Phone #: ###-####
|
Plan Reviewer's activity | | | 5/1/2019 | | DONE |
Joe Bruce
|
|
|
Spoke with Daryl Spivey about plumbing inspection. No Plumbing Inspection is necessary under the TI permit. Called Tyler regarding the inspection. **JHB**
|
BLD-Framing/Rough-in | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | CANC |
Dave Hannah
|
|
|
Clint Phone #: ###-####
|
(F) Reprint permit | | | 4/16/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/16/2019 | | DONE |
|
|
|
|
Place hold on job | 4/2/2019 | | 4/3/2019 | | DONE |
Judith Amador
|
|
|
Met-Waiting for signed permit
|
Issue PAID IN FULL permit | | | 4/1/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/1/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/1/2019 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2019 | | DONE |
|
|
|
called Tyler-rev cert of val is for just this TI but the cert of val that was filled out with the permit app was for the whole project which includes 4 TI's-that's why it's so different
|
Plan assigned to (JHB) | 3/18/2019 | 3/18/2019 | 3/28/2019 | | PASS |
Joe Bruce
|
|
|
03/29 (L2) - Awakening our Soul, ePlan
|
Routing - PLAN CHECK | 3/18/2019 | | 3/28/2019 | | PASS |
Joe Bruce
|
|
|
|
1st review completed | | | 3/28/2019 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/28/2019 | | DONE |
|
|
|
all met- emailed fees due to Tyler-NEED
GC FORM
REVISED VALUE
|
Intake Approval | | | 3/18/2019 | | PASS |
Joe Bruce
|
|
|
Prescreen approved by Javier Guzman.
|
Routing - Addressing | 3/18/2019 | | 3/18/2019 | | PASS |
Doug Chausow
|
|
|
Corrected address to 118 N 5th St
|
Routing - PUBLIC WORKS | 3/18/2019 | | 3/18/2019 | | PASS |
Angela Hardy
|
|
|
|
Application received | | | 3/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 12 2019 8:21PM
|