BLD-Final | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | DONE |
Tony Young
|
|
|
before 4:30 // Vince Phone #: ###-####// LOC issued
|
DOC - Permit Finaled | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Tony Young
|
|
|
|
Zoning Approval | 1/31/2020 | 1/31/2020 | 1/31/2020 | | PASS |
KayCee Babb
|
|
|
Per DRH19-00206
|
BLD-Final | 1/28/2020 | 1/29/2020 | 1/29/2020 | A | NH |
Dave Hannah
|
|
|
call for access code // Vince Phone #: ###-#### called three time no anwser
|
BLD-Aging Inspection | 1/16/2020 | 1/16/2020 | 1/22/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/15/2020 | 1/15/2020 | 1/21/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Foundation | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | DONE |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Conference | 8/9/2019 | 8/12/2019 | 8/12/2019 | A | PART |
Tony Young
|
|
|
Richard-- please call for access Phone #: ###-####,, looked at 2 pins on the property of where the moved on house front will sit,, setbacks appear ok per plan,, will verify again when footings are called in for inspection
|
Issue PAID IN FULL permit | | | 7/9/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/5/2019 | | |
|
|
|
|
Telephone call | | | 7/5/2019 | | DONE |
|
|
|
spoke with vince informing him that this permit is ready. stated he would like to be the rp and act as the gc (rce number was given on app, but he signed)
|
Telephone call | | | 7/5/2019 | | DONE |
|
|
|
spoke with vince informing him that either achd needs to sign the permit or MB Servies since he is not parcel owner yet
|
Permit Ready to Issue | | | 7/5/2019 | | DONE |
|
|
|
NEED
RP
|
Plan assigned to (JAB) Josh | 7/2/2019 | 7/2/2019 | 7/3/2019 | | PASS |
Josh Bogle
|
|
|
07/05 house move, paper
|
Routing - MECHANICAL | 7/2/2019 | | 7/3/2019 | | PASS |
Troy James
|
|
|
Any new equipment added will required a manual j report. Mechanical ventilation not required. No mechanical review at this time.
|
Routing - PLAN CHECK | 7/3/2019 | | 7/3/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/3/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/3/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/3/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Route to Impact Fee Review | 7/2/2019 | 7/8/2019 | 7/2/2019 | | PASS |
Shannon Cade
|
|
|
|
Routing Walk-In (Zoning) | 7/2/2019 | 7/2/2019 | 7/2/2019 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 7/2/2019 | 7/2/2019 | 7/2/2019 | A | PASS |
Josh Bogle
|
|
|
This permit needs to be routed like a new home. Please take permit in - I am taking this in, as instructed **JAB**
|
Routing - Addressing | 7/2/2019 | | 7/2/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/2/2019 | | 7/2/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing Walk-In (Zoning) | 7/1/2019 | 7/1/2019 | 7/1/2019 | A | DONE |
Brittany Hill
|
|
|
|
Routing Walk-In (BLD) | 7/1/2019 | 7/1/2019 | 7/1/2019 | A | FAIL |
KayCee Babb
|
|
|
No application. Not ready for zoning yet.
|
Routing Walk-In (BLD) | 6/14/2019 | 6/14/2019 | 6/14/2019 | A | FAIL |
Josh Bogle
|
|
|
questions on what kind of plans are needed
|
Routing - PLAN CHECK | 6/14/2019 | | 6/14/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 6/14/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 3/13/2019 | 3/13/2019 | 3/13/2019 | A | FAIL |
Karla Nelson
|
|
|
ACHD bought a portion of the property the remaining parcel is only 4,336 SF and is substandard for the R-2 zone. Design Review approval will be required.
|
Application received | | 3/13/2019 | | | |
|
|
|
|