Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-00785
StatusFinaled
Name MB SERVICES LLC
Site Address 1005 N STILSON RD
Project NameHouse Move
Customer NumberDEMO BLD17-00074
ePlanReviewNo
Description
(BOND RQUIRED BEFORE ISSUANCE $4500) (HOUSE MOVE PERMIT MIS19-00064) Permit for a foundation to support a 784sq' home that is being moved from another location. A previous home on this location was torn down under permit BLD17-00074. All work per plans, notations, attachments, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/31/20201/31/20201/31/2020PDONE
DetailsTony Young
before 4:30 // Vince Phone #: ###-####// LOC issued
DOC - Permit Finaled1/31/20201/31/20201/31/2020PPASS
DetailsTony Young
Zoning Approval1/31/20201/31/20201/31/2020 PASS
DetailsKayCee Babb
Per DRH19-00206
BLD-Final1/28/20201/29/20201/29/2020ANH
DetailsDave Hannah
call for access code // Vince Phone #: ###-#### called three time no anwser
BLD-Aging Inspection1/16/20201/16/20201/22/2020 PEND
DetailsTony Young
BLD-Aging Inspection1/15/20201/15/20201/21/2020 PEND
DetailsTony Young
BLD-Foundation9/3/20199/3/20199/3/2019PDONE
DetailsTony Young
Bill Phone #: ###-####
BLD-Footing8/30/20198/30/20198/30/2019PPASS
DetailsTony Young
Bill Phone #: ###-####
BLD-Conference8/9/20198/12/20198/12/2019APART
DetailsTony Young
Richard-- please call for access Phone #: ###-####,, looked at 2 pins on the property of where the moved on house front will sit,, setbacks appear ok per plan,, will verify again when footings are called in for inspection
Issue PAID IN FULL permit  7/9/2019 DONE
OVERRIDE  7/5/2019  
Telephone call  7/5/2019 DONE
spoke with vince informing him that this permit is ready. stated he would like to be the rp and act as the gc (rce number was given on app, but he signed)
Telephone call  7/5/2019 DONE
spoke with vince informing him that either achd needs to sign the permit or MB Servies since he is not parcel owner yet
Permit Ready to Issue  7/5/2019 DONE
NEED
RP
Plan assigned to (JAB) Josh7/2/20197/2/20197/3/2019 PASS
DetailsJosh Bogle
07/05 house move, paper
Routing - MECHANICAL7/2/2019 7/3/2019 PASS
DetailsTroy James
Any new equipment added will required a manual j report. Mechanical ventilation not required. No mechanical review at this time.
Routing - PLAN CHECK7/3/2019 7/3/2019 PASS
DetailsJosh Bogle
1st review completed  7/3/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  7/3/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  7/3/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  7/3/2019 DONE
DetailsJosh Bogle
ESC yes - Energy no
Route to Impact Fee Review7/2/20197/8/20197/2/2019 PASS
DetailsShannon Cade
Routing Walk-In (Zoning)7/2/20197/2/20197/2/2019APASS
DetailsSue Cummings
Routing Walk-In (BLD)7/2/20197/2/20197/2/2019APASS
DetailsJosh Bogle
This permit needs to be routed like a new home. Please take permit in - I am taking this in, as instructed **JAB**
Routing - Addressing7/2/2019 7/2/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/2/2019 7/2/2019 PASS
DetailsMorgan Webb
Routing Walk-In (Zoning)7/1/20197/1/20197/1/2019ADONE
DetailsBrittany Hill
Routing Walk-In (BLD)7/1/20197/1/20197/1/2019AFAIL
DetailsKayCee Babb
No application. Not ready for zoning yet.
Routing Walk-In (BLD)6/14/20196/14/20196/14/2019AFAIL
DetailsJosh Bogle
questions on what kind of plans are needed
Routing - PLAN CHECK6/14/2019 6/14/2019 FAIL
DetailsJosh Bogle
1st review completed  6/14/2019 FAIL
DetailsJosh Bogle
Routing Walk-In (Zoning)3/13/20193/13/20193/13/2019AFAIL
DetailsKarla Nelson
ACHD bought a portion of the property the remaining parcel is only 4,336 SF and is substandard for the R-2 zone. Design Review approval will be required.
Application received 3/13/2019