Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-00791
StatusFinaled
Name RIVERWOOD HOMES
Site Address 7549 S WAGONS WEST AVE
Project NameHudson- BP2-05/06
Customer Number 
ePlanReviewYes
Description
WUI VALLEY, PERIMETER LOT, ZONE "B" WITH ZONE"A" REQUIREMENTS. CLASS "A" ROOF REQUIRED. Permit for the construction of a new 2389 sq. ft., two story (first story 1046 sq. ft., second story 1343 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 300 sq. ft. of covered patio/porch and a 720 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. Prescriptive Energy Code Proposed. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/3/201910/3/201910/3/2019PPASS
DetailsJim Storey
access is 9378 Phone #: ###-#### Inspection requested via web by jarrod nelson
DOC - Permit Finaled10/3/201910/3/201910/3/2019PPASS
DetailsJim Storey
BLD-Blower Door Test Results10/3/201910/3/201910/3/2019PDONE
DetailsJim Storey
access is 9378 Phone #: ###-#### Inspection requested via web by jarrod nelson 4.9
BLD-Energy code compliance8/11/20198/12/20198/12/2019APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by jarrod nelson
BLD-Framing/Rough-in8/11/20198/12/20198/12/2019APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by jarrod nelson
BLD-Framing/Rough-in8/5/20198/5/20198/5/2019PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jarrod Nelson c/n 3 p[ly needs nailling per engineering// ok to insulate
BLD-Wall Bracing7/24/20197/24/20197/24/2019APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jarrod Nelson
BLD-Footing5/7/20195/7/20195/7/2019PPASS
DetailsJim Storey
Derek Phone #: ###-####
Inspection Record Card- Bld  4/2/2019 DONE
Issue PAID IN FULL permit  4/2/2019 DONE
OVERRIDE  3/29/2019  
Plan assigned to (BJM)3/15/20193/15/20193/29/2019 DONE
DetailsBrian McGowan
04/03 - 1st Review Complete 03/28 (L1 sfd) ePlan
Routing - PLAN CHECK3/29/2019 3/29/2019 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/29/2019 DONE
DetailsBrian McGowan
Permit Ready to Issue  3/29/2019 DONE
met
Routing - PLAN CHECK3/15/2019 3/26/2019 FAIL
DetailsBrian McGowan
Spread footings required
1st review completed  3/26/2019 FAIL
DetailsBrian McGowan
Route to Impact Fee Review3/15/20193/18/20193/18/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Intake Approval  3/15/2019 PASS
Recd Pcfee & Taken To Pln CK  3/15/2019 DONE
Routing - MECHANICAL3/15/2019 3/15/2019 PASS
DetailsTroy James
Routing - PLANNING3/15/2019 3/15/2019 PASS
DetailsSue Cummings
Routing - Addressing3/15/2019 3/15/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/15/2019 3/15/2019 PASS
DetailsMorgan Webb
Application received  3/13/2019 DONE
Application submitted via PDS Online on Mar 13 2019 12:11PM