Permit Information
Permit NumberBLD19-00794
StatusIssued
Name TWEIT CONSTRUCTION LLC
Site Address 6323 S FEDERAL WAY
Project NameGo To My Garage (Units 1-12)
Customer NumberEPLAN BLD19-00426
ePlanReviewNo
Description
(GO TO MY GARAGE) (BLD19-00794 & BLD19-00426)(ESC19-00141) (DRH17-00576) **(2) PERMITS UNDER (1) EPLAN** This building does not have a fire sprinkler system. Permit is to construct a new 14,440 square foot self-storage building with 12 individual self-storage condo units that each have a service sink, water closet, and lavatory. (each with 325 SF mezzanine). Unit #3 will be accessible per chapter 11 of the 2015 IBC. This building is one of two buildings on this site. Work is to include site work; concrete footings; minimum 4” thick concrete slab on grade; wood stud bearing and shear walls; wood shear panels; steel exterior siding; steel roof panels; metal gutters; exterior side-hinged swinging doors; and roll-up doors. Special Inspection is required for soils per attached form #310. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other7/21/20207/22/20207/22/2020APASS
DetailsJim Storey
Roof Nailing - Joe */Screened*/ Phone #: ###-####
BLD-Footing6/30/20207/1/20207/1/2020APASS
DetailsJim Storey
Joe Phone #: ###-####
BLD-Footing4/21/20204/21/20204/21/2020PPASS
DetailsJim Storey
screened // Joe Phone #: ###-####
Meeting  8/13/2019 DONE
emailed tweitconst@gmail.com, letting them know we have everything from achd and someone may come in to pick up the plans and sign for the permits
Print Occupancy Form  8/13/2019 DONE
Issue PAID IN FULL permit  8/13/2019 DONE
Expiration Notice8/2/20198/23/20198/2/2019 DONE
DetailsBrittany Hill
Expiration Notice7/30/20198/20/20197/30/2019 DONE
DetailsBrittany Hill
Plan assigned to (JHB)3/13/20193/13/20196/26/2019 PASS
DetailsJoe Bruce
06/27 (4th Rev) 04/19 (502) Go To My Garage, ePlan (Bldg, Fire, PW Street Lights)
PLANS/APPL TAKEN TO FRONT DESK  6/26/2019 DONE
DetailsJoe Bruce
Permit Ready to Issue  6/26/2019 DONE
MET
NEED
ACHD
GC FORM
REVISED VALUE
Routing Off Site - STRUCTURAL6/20/2019 6/26/2019 PASS
DetailsJoe Bruce
AHJ
Routing - FIRE6/20/20196/20/20196/25/2019 PASS
DetailsMark Scharfen
06/27-4th resubmittal. 1 hour on permit. Uploaded rev_fire 06.26.2019.pdf
Routing - PLAN CHECK6/20/2019 6/25/2019 PASS
DetailsJoe Bruce
Routing - Design Review6/20/2019 6/21/2019 PASS
DetailsKatelyn Menuge
Routing PW Street Lights6/20/2019 6/21/2019 PASS
DetailsTom Marshall
Plan resubmittals received  6/20/2019 DONE
DetailsJoe Bruce
Routing - FIRE5/31/20195/31/20196/10/2019 FAIL
DetailsMark Scharfen
06.10.2019-completed fire review. uploaded rev_fire 06.10.2019.pdrf and emailed architect.
Routing - PLAN CHECK5/31/2019 6/7/2019 FAIL
DetailsJoe Bruce
Routing Off Site - STRUCTURAL5/31/2019 6/6/2019 PASS
DetailsJoe Bruce
ahj
Routing PW Street Lights5/31/2019 6/3/2019 FAIL
DetailsTom Marshall
Plan resubmittals received  5/31/2019  
DetailsJoe Bruce
Routing - Design Review5/31/2019 5/31/2019 PASS
DetailsKatelyn Menuge
Routing - PLAN CHECK5/14/2019 5/22/2019 FAIL
DetailsJoe Bruce
Routing PW Drainage5/14/2019 5/22/2019 PASS
DetailsBrian McGowan
Routing PW Solid Waste5/14/2019 5/22/2019 PASS
DetailsPeter J. McCullough
Plan resubmittals requested  5/22/2019 DONE
DetailsJoe Bruce
emailed plan review report to architect.
Routing Off Site - STRUCTURAL5/14/2019 5/17/2019 FAIL
DetailsJoe Bruce
Routing - FIRE5/14/20195/14/20195/15/2019 FAIL
DetailsMark Scharfen
IFC review completed 05/15. Uploaded rev_fire 05.15.2019.pdf and emailed architect.
Routing PW Street Lights5/14/2019 5/15/2019 PASS
DetailsTom Marshall
Street lights will be tracked under BLD19-00426.
Routing - Design Review5/14/2019 5/14/2019 FAIL
DetailsKatelyn Menuge
Need additional drainage swale information and pedestrian pathway 5 feet wide.
Plan resubmittals received  5/7/2019 DONE
DetailsJoe Bruce
Plan resubmittals requested  5/7/2019 DONE
DetailsJoe Bruce
1) Please revise the following sheets with the Alaska Architect stamp: ASL-1, LS-1, A3-3, A3-1, A2-1, A2-0, A1-0. These sheets all have the Alaska stamp. - The sheets do not show the Idaho registration number for your architecture license.
Plan resubmittals received  5/2/2019 FAIL
DetailsJoe Bruce
Sheet S3.4 was not uploaded into the drawings folder. I have deleted sheet SK-S1.

Please revise the following sheets with the Alaska Architect stamp: ASL-1, LS-1, A3-3, A3-1, A2-1, A2-0, A1-0. These sheets all have the Alaska stamp.

The Architect License has expired as the May 1st and is no longer valid in the state of Idaho. Please have this license renewed or re-instated prior to resubmitting. Provide proof that this license has been reinstated. (See image below)
Plan resubmittals requested  5/2/2019 DONE
Plan resubmittals received  4/25/2019 FAIL
DetailsJoe Bruce
Plan resubmittals requested  4/25/2019 DONE
DetailsJoe Bruce
The resubmittal could not be processed due to the following items listed below. Please address each item and resubmit the required items.
1) Sheet SK-S1 does not meet our minimum requirements. Plan sheet does not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheet with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block.
2) Sheet SK-S1 does not meet our minimum requirements. Minimum sheet size accepted is 18”x24”. Enlarge the sheet size as required.
3) The Alaska architect stamp provided on the resubmitted drawings cannot be accepted. Please provide the architect stamp for the state of Idaho.
Route to Impact Fee Review4/18/20194/21/20194/22/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - FIRE3/13/20193/13/20194/18/2019 FAIL
DetailsMark Scharfen
Review uploaded and emailed to architecht.
Routing - PLAN CHECK3/13/2019 4/18/2019 FAIL
DetailsJoe Bruce
1st review completed  4/18/2019 FAIL
DetailsJoe Bruce
Plan resubmittals requested  4/18/2019 DONE
DetailsJoe Bruce
Emailed architect plan review report.
Routing Off Site - STRUCTURAL3/13/2019 3/26/2019 FAIL
DetailsJoe Bruce
Routing - PUBLIC WORKS3/13/2019 3/20/2019 PASS
DetailsAngela Hardy
Routing - MECHANICAL3/13/2019 3/18/2019 PASS
DetailsTroy James
Routing - Design Review3/13/2019 3/15/2019 FAIL
DetailsKatelyn Menuge
See changemarks
Routing - Addressing3/13/2019 3/15/2019 PASS
DetailsDoug Chausow
Routing - Erosion and Sediment3/13/2019 3/14/2019 PASS
DetailsMichael Zawacki
Site prep and inspection required.
Routing - PLUMBING3/13/2019 3/13/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING3/13/2019 3/13/2019 PASS
DetailsNicolette Womack
Intake Approval  3/13/2019  
Intake Approval  3/13/2019  
Plan Reviewer's activity  3/13/2019  
Intake Approval  3/11/2019 PASS
Application received 3/13/2019   
Application received 3/13/2019