Third Notice | | 5/12/2020 | 7/8/2020 | | DONE |
|
|
|
mailed 7-9-2020 with third and final follow up
|
Third Follow up | | | 7/8/2020 | | DONE |
|
|
|
final follow up
|
Third Notice | | 4/8/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020 with second follow up
|
Second Follow up | | | 5/7/2020 | | DONE |
|
|
|
|
Third Notice | | 3/10/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-3-2020 with first follow up letter
|
First Follow up | | | 4/3/2020 | | DONE |
|
|
|
|
Third Notice | | 2/11/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
Third Notice | | 1/4/2020 | 2/6/2020 | | DONE |
|
|
|
mailed 2-7-20
|
Second Notice | | 12/5/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
First Notice | | 12/1/2019 | 11/25/2019 | | DONE |
|
|
|
mailed 12-2-19
|
BLD-Final | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PASS |
Brandon Shaw
|
|
|
Call ahead for access // Morgan Phone #: ###-####
|
DOC - Permit Finaled | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PASS |
Brandon Shaw
|
|
|
|
Override - Condition Holds | | | 11/21/2019 | | |
|
|
|
|
Permanent Occupancy | | | 11/21/2019 | | DONE |
|
|
|
|
Telephone call | | | 11/21/2019 | | DONE |
|
|
|
sent certificate of occupancy to -morgan@alpinebikeparks.com
|
FIRE-Final Inspection | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete, signature provided on permit sign off card.
Morgan Phone #: ###-####
|
BLD-Other | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | CANC |
Brandon Shaw
|
|
|
per appilcant, Morgan, this inspection is not needed- bike ramps // Morgan Phone #: ###-####
|
Override - Condition Holds | 11/15/2019 | 1/1/1900 | 11/15/2019 | | |
|
|
|
not a final
|
Elevation Cert Rec'd-Final | | | 11/4/2019 | | DONE |
|
|
|
Recieved Final EC.
|
BLD-Other | 10/11/2019 | 10/14/2019 | 10/14/2019 | A | PASS |
Brandon Shaw
|
|
|
mORGAN- BIKE RAMP INSPECTION Phone #: ###-####
|
BLD-Other | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | PASS |
Dave Hannah
|
|
|
bike ramp // Morgan Phone #: ###-####
|
BLD-Other | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Dave Hannah
|
|
|
bike ramps. // Morgan Phone #: ###-####
|
BLD-Other | 9/25/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Dave Hannah
|
|
|
bike ramp // Morgan Phone #: ###-####
|
BLD-Footing | 9/10/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Dave Hannah
|
|
|
Morgan Phone #: ###-####
|
BLD-Other | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Dave Hannah
|
|
|
bicycle ramps // Morgan Phone #: ###-####
|
BLD-Footing | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Mike Jordan
|
|
|
Mike- after 8:30am Phone #: ###-####. Footings for nothr west and south west canopy covers ok.
|
Expiration Notice | 8/2/2019 | 8/23/2019 | 8/2/2019 | | DONE |
Brittany Hill
|
|
|
|
Issue & PRINT to be Invoiced | | | 8/2/2019 | | DONE |
|
|
|
JV in process
|
Print Occupancy Form | | | 8/2/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 5/8/2019 | 6/18/2019 | 7/30/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 06/11/19 (New building - 25 days) (eplan - 37 sheets) Military Reserve Bike and Dog Park (waiting for PW)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/30/2019 | | DONE |
|
|
|
ALL MET
Need
GC Form
Revised Cert of Value
**JV account emailed to Tisha is the City is paying for the fees)
|
Routing PW Flood Plain | 7/26/2019 | | 7/29/2019 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLAN CHECK | 7/25/2019 | | 7/26/2019 | | PASS |
Carl Westfall
|
|
|
Passed 3rd review
|
Plan resubmittals received | | | 7/25/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/23/2019 | | 7/24/2019 | | FAIL |
Carl Westfall
|
|
|
Back to applicant - failed 2nd review
|
Plan resubmittals requested | | | 7/24/2019 | | DONE |
|
|
|
Sent back to the applicant to upload drawings that should have been uploaded
|
Plan resubmittals received | | | 7/23/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/18/2019 | 6/21/2019 | 6/19/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 5/8/2019 | 5/13/2019 | 6/18/2019 | | PASS |
Mark Scharfen
|
|
|
06/18-Tents will only be up max 180 days. No fire review required.
|
1st review completed | | | 6/18/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/18/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/13/2019 | | 6/13/2019 | | FAIL |
Carl Westfall
|
|
|
1st IBC review done. Everything will be done under one permit. The value of the project needs to be changed to included all canopies plus everything else. Toilet room building was done under permit BLD19-00653.
|
Plan resubmittals requested | | | 6/13/2019 | | DONE |
|
|
|
IBC plan review report Emailed.
|
Routing PW Drainage | 5/13/2019 | | 5/29/2019 | | CANC |
Jason C. Taylor
|
|
|
not required.
|
Routing PW Flood Plain | 5/13/2019 | | 5/29/2019 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in ePlan. JCT
|
Routing PW Grading-Hillside | 5/13/2019 | | 5/29/2019 | | CANC |
Jason C. Taylor
|
|
|
not required.
|
Routing - Erosion and Sediment | 5/8/2019 | | 5/14/2019 | | PASS |
Andy J. Long
|
|
|
no new ESC permit required, please see ESC18-01687
|
Routing PW Solid Waste | 5/13/2019 | | 5/14/2019 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PLANNING | 5/8/2019 | | 5/14/2019 | | PASS |
Brent Moore
|
|
|
|
Routing - Addressing | 5/8/2019 | | 5/13/2019 | | PASS |
Doug Chausow
|
|
|
Updated dog park address
|
Routing - PUBLIC WORKS | 5/8/2019 | | 5/13/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing PW Street Lights | 5/13/2019 | | 5/13/2019 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 5/8/2019 | | PASS |
Javier Guzman
|
|
|
Intake approval/fees paid 05/08/19.
|
Intake Approval | | | 4/5/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Previous request not addressed, Provide structural calculation for the new shade structures (such as the shade structure shown on plan sheet SGS 1.2) that are stamped, signed and dated by an Idaho licensed engineer.
• Provide a completed special inspection form 310, the cover sheet is incomplete and missing information such as permit #, address, design professional info, owner or design professional info and signature.
|
Intake Approval | | | 3/15/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• The uploaded verification of legal lot and parcel form is required to be signed and approved by PDS Subdivision Staff
• The uploaded Drainage O&M needs is required to be stamped and signed by Idaho licensed design professional
• Provide an Erosion & Sediment Control (ESC) Narrative. The Narrative must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
• Provide revised plan sheets SGS1.2 and SGS1.1 to show code based on the current adopted 2015 IBC not the 2012 IBC as shown
• Per ePlan submittal standards reserve the bottom right corner for City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block for plan sheets SGS1.2, SGS1.1
• Plan sheet file C2.02 when opened shows it is plan sheet C1.00, provide the correct C2.02 dog park grading plans
• Provide a stamped plan sheet by an Idaho licensed architect on plan sheet L1.01, T1.14, T1.13, T1.12 and T1.11,
• Provide structural calculation for the new structures that are stamped, signed and dated by an Idaho licensed engineer.
• Provide a completed special inspection form 310 which can be found at https://pds.cityofboise.org/media/104147/final310_special_inspections.pdf
• Plan sheet L2.02 is un-viewable and takes too long to open and keeps crashing my computer which usually means there are too many layers on this file. Flatten all the layers and re-upload so that this does not continue to occur
• The checklist states that Plan sheet L2.01 states there is a back flow protection but could not be found
|
Application received | | | 3/14/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 14 2019 1:40PM
|
Third Notice | | 7/13/2020 | | | |
|
|
|
|