BLD-Final | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Dave Hannah
|
|
|
call for garage code - Todd Phone #: ###-####
|
DOC - Permit Finaled | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/19/2019 | 7/22/2019 | 7/23/2019 | A | NR |
Dave Hannah
|
|
|
Please call 60 minutes before you head that direction so we can meet you to open up. Thanks Phone #: ###-#### Inspection requested via web by anthony boyd needs safty glassing by door and smoke and co2 detectors
|
BLD-Framing/Rough-in | 4/11/2019 | 4/11/2019 | 4/11/2019 | P | PASS |
Brandon Shaw
|
|
|
Ok to insulate and cover...
|
Issue PAID IN FULL permit | | | 3/15/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/14/2019 | | 3/14/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/14/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/14/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/14/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/14/2019 | | DONE |
|
|
|
customer will be back with a check-plans are in the res walking drawer
|
Telephone call | | | 3/14/2019 | | DONE |
|
|
|
didn't call-customer was here and will be back with a check
|
Application received | | 3/14/2019 | | | |
|
|
|
|