BLD-Conference | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | DONE |
Tell Riley
|
|
|
Mark *screened* Phone #: ###-####//need ele final//needto add smoke detectors in bedrooms and smoke/co detectors outside bedrooms and in addition--ust be interconnected//flashing at roof will be replaced when new roof is installed this summer//add landing at exterior doors//add 2min or solid core door self closing at garage/ addition doorway//
|
BLD-Energy code compliance | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Tell Riley
|
|
|
Call ahead to meet // Noel Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2019 | 9/10/2019 | 9/10/2019 | A | PASS |
Tell Riley
|
|
|
Mark Phone #: ###-####//ok per plans// ok to insulate only//
|
BLD-Wall Bracing | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PART |
Tell Riley
|
|
|
Mark Phone #: ###-####//add shear blocking and nail at blocks//discussed onsite//will check at framing//
|
BLD-Foundation | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Jim Sly
|
|
|
Mark Phone #: ###-####
|
BLD-Footing | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Jim Sly
|
|
|
Mark-(husband) Phone #: ###-####
|
Routing Walk-In (BLD) | 4/15/2019 | 4/15/2019 | 4/15/2019 | A | DONE |
Gemma Flores
|
|
|
|
Routing Walk-In (BLD) | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (RDP) | 4/15/2019 | 4/15/2019 | 4/15/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/15/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/15/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/15/2019 | | 4/15/2019 | | PASS |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 4/15/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 4/15/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing Walk-In (Zoning) | 4/5/2019 | 4/5/2019 | 4/5/2019 | A | PASS |
Ethan Mansfield
|
|
|
originally a detached outbuilding. now attached shop by garage
|
Routing Walk-In (BLD) | 4/5/2019 | 4/5/2019 | 4/5/2019 | P | FAIL |
Josh Bogle
|
|
|
no contact with applicant
|
Routing Walk-In (Zoning) | 3/18/2019 | 3/18/2019 | 3/18/2019 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/18/2019 | 3/18/2019 | 3/18/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/18/2019 | | 3/18/2019 | | FAIL |
Josh Bogle
|
|
|
needs tall wall and lateral engineering
|
Routing Walk-In (Zoning) | 3/15/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Ethan Mansfield
|
|
|
|
1st review completed | | | 3/15/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 3/15/2019 | | | |
|
|
|
|