Third Notice | | 7/13/2020 | 8/10/2020 | | DONE |
|
|
|
mailed 8-14-2020
|
Third Notice | | 5/12/2020 | 7/8/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
Second Notice | | 4/13/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
First Notice | | 3/16/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
BLD-Final | 3/5/2020 | 3/6/2020 | 3/6/2020 | P | PASS |
Brandon Shaw
|
|
|
tyler Phone #: ###-####3
|
DOC - Permit Finaled | 3/6/2020 | 3/6/2020 | 3/6/2020 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The new projector does pause movie and sound upon fire alarm activation./
Tyler Phone #: ###-####
|
Permanent Occupancy | | | 3/6/2020 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | CANC |
Troy Cobbley
|
|
|
Need a fire alarm permit for the relocated horn/strobes as discussed prior to a life safety inspection.
Tyler Phone #: ###-####
|
FIRE-Conference | 2/28/2020 | 2/28/2020 | 2/28/2020 | A | DONE |
Jim Page
|
|
|
Need to verify coverings around screen, could not verify at time of conference. Sprinkler heads will need to be added if obstructions are installed above screen.
|
FIRE-Final Inspection | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | CANC |
Jim Page
|
|
|
Request turned into a conference, this request is cancelled.
tyler Phone #: ###-####
|
BLD-Framing/Rough-in | 1/31/2020 | 1/31/2020 | 2/3/2020 | P | PASS |
Dave Hannah
|
|
|
Tyler Phone #: ###-#### lower level and stairs
|
BLD-Framing/Rough-in | 1/21/2020 | 1/21/2020 | 1/22/2020 | P | PART |
Dave Hannah
|
|
|
Tyler Phone #: ###-#### upper setting area ok to cover
|
BLD-Conference | 1/14/2020 | 1/14/2020 | 1/17/2020 | P | DONE |
Dave Hannah
|
|
|
Tyler Phone #: ###-####
|
FIRE-Conference | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | DONE |
Troy Cobbley
|
|
|
Discussed fire alarm, fire sprinkler and life safety requirements.
Ziggy Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/21/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/21/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/21/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/21/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 10/1/2019 | 10/1/2019 | 10/16/2019 | | PASS |
Joe Bruce
|
|
|
10/21 (plan mod) Regal 4DX Theater, ePlan
|
Routing - PLAN CHECK | 10/16/2019 | | 10/16/2019 | | PASS |
Joe Bruce
|
|
|
|
Permit Ready to Issue | | | 10/16/2019 | | DONE |
|
|
|
MET
Need GC
Need Rev Val
|
Routing - PLAN CHECK | 10/10/2019 | | 10/10/2019 | | FAIL |
Joe Bruce
|
|
|
Exits must be separated by 1/3 the diagonal distance.
|
Plan resubmittals requested | | | 10/10/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 10/1/2019 | | DONE |
|
|
|
tenant remodel of auditorium 2 of existing (21) screen cinema. per Lucy Wu
|
CHANGE STATUS TO (REV) | | | 10/1/2019 | | DONE |
|
|
|
resubmittal
|
Change Expiration Date Only | | | 9/26/2019 | | DONE |
|
|
|
first permit extension requested granted by Joe Bruce. 180 days
|
Telephone call | | | 9/23/2019 | | |
|
|
|
Spoke with Lucy to see how she would like to continue with this project. she stated they will send in a request for an extension
|
Expiration Notice | 8/14/2019 | 9/5/2019 | 8/14/2019 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (JHB) | 4/25/2019 | 4/25/2019 | 6/11/2019 | | PASS |
Joe Bruce
|
|
|
06/10 (2nd Rev) 05/17 (L3) Regal 21, 4DX Theater, eplan
|
Routing - PLAN CHECK | 6/3/2019 | | 6/11/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 6/3/2019 | | 6/11/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/11/2019 | | DONE |
|
|
|
Need GC
need rev cert of val
|
Plan resubmittals received | | | 6/3/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 5/17/2019 | 5/20/2019 | 5/17/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 4/25/2019 | 4/25/2019 | 5/17/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 5/17/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 5/17/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 4/25/2019 | | 5/16/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 4/25/2019 | | 5/7/2019 | | FAIL |
Joe Bruce
|
|
|
KPFF
|
Routing - Erosion and Sediment | 4/25/2019 | | 4/25/2019 | | PASS |
Michael Zawacki
|
|
|
Void, no ESC required, interior renovation.
|
Routing - PLUMBING | 4/25/2019 | | 4/25/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 4/25/2019 | | 4/25/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/25/2019 | | 4/25/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING
|
Intake Approval | | | 4/22/2019 | | PASS |
|
|
|
|
Intake Approval | | | 4/4/2019 | | FAIL |
Joe Bruce
|
|
|
Additional Items Needed on the checklist:
5) Per checklist: Form #304, Registered Design Professional Form was not submitted. Please provide form #304 into the documents folder with the owners signature and design professional information.
6) Per Checklist: Site Specific Fire Flow at the fire hydrant letter is required from Suez Water. Please email: katie.birkenstein@suez.com for your request to receive the required letter for plan review. Upload this document into the documents folder.
|
Intake Approval | | | 3/29/2019 | | FAIL |
Joe Bruce
|
|
|
Please note that you have submitted the wrong application for the scope of this project. This should be submitted as a #520 Major TI and not the #502 New Commercial / Addition Application. Provide the following to complete your prescreen:
1) Complete and fill out checklist #520 Major Tenant Improvement Checklist and upload this document into the "documents" folder. This document must be completely filled out and all drawings/documents provided.
2) The drawing file size cannot exceed 1.0 MB per drawing file. Please reduce the electronic file size of the individual drawings that exceed 1.0 MB and upload.
3) Electrical, Mechanical, and Structural drawings do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
4) The Architect's stamp is missing the a date and signature on all the drawings. Please provide the signature and date per the Idaho State Board rules and regulations.
|
Application received | | | 3/15/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 15 2019 10:17AM
|
Third Notice | | 8/15/2020 | | | |
|
|
|
|