BLD-Aging Inspection | 1/16/2020 | 1/16/2020 | 1/16/2020 | | DONE |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 1/16/2020 | 1/16/2020 | 1/16/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Brandon Shaw
|
|
|
Matt- 1st thing in the a.m Phone #: ###-####
|
BLD-Final | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | NH |
Brandon Shaw
|
|
|
No access...
|
BLD-Other | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Brandon Shaw
|
|
|
Wall bracing...
|
BLD-Footing | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | PASS |
Jim Storey
|
|
|
Bernie Phone #: ###-####
|
OVERRIDE | | | 5/1/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 5/1/2019 | 5/1/2019 | 5/1/2019 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 4/3/2019 | 4/3/2019 | 5/1/2019 | | PASS |
Josh Bogle
|
|
|
applicant left this on my desk - needs engineering for lateral
|
Plan Reviewer's activity | | | 5/1/2019 | | |
|
|
|
Couldn't find paperwork so they will be back at noon to finish.
|
Issue PAID IN FULL permit | | | 5/1/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/1/2019 | | 5/1/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/1/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 5/1/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 3/19/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 3/19/2019 | 3/19/2019 | 3/19/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/19/2019 | | 3/19/2019 | | FAIL |
Josh Bogle
|
|
|
irregular building - wall bracing requires engineering
|
1st review completed | | | 3/19/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 3/19/2019 | | | |
|
|
|
|