BLD-Energy code compliance | 6/12/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Jim Storey
|
|
|
screened // Gabe Phone #: ###-####
|
BLD-Conference | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Jim Storey
|
|
|
Gabe Phone #: ###-#### insulation ok
|
BLD-Framing/Rough-in | 6/5/2020 | 6/8/2020 | 6/8/2020 | A | PASS |
Jim Storey
|
|
|
GABE Phone #: ###-####
|
BLD-Conference | 5/4/2020 | 5/6/2020 | 5/6/2020 | A | PASS |
Jim Storey
|
|
|
Screened- inspection for 12:30 Gabe Phone #: ###-#### exterior sheer nail ok// stair review ok// plate plan to be submitted to joe to delete wall protection west side.
|
BLD-Aging Inspection | 4/22/2020 | 4/22/2020 | 4/22/2020 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Foundation | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Jim Storey
|
|
|
call for gate code // Gabe Phone #: ###-####
|
BLD-Foundation | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | PASS |
Jim Storey
|
|
|
Gabe Phone #: ###-#### si compaction report pending
|
Print Occupancy Form | | | 8/19/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/19/2019 | | DONE |
|
|
|
|
Expiration Notice | 8/2/2019 | 8/23/2019 | 8/2/2019 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 7/19/2019 | | |
|
|
|
|
Plan assigned to (JHB) | 4/4/2019 | 4/4/2019 | 7/19/2019 | | PASS |
Joe Bruce
|
|
|
07/22 (3rd Rev) 05/15 - 502 Wildan Firefighter Memorial
|
Routing Off Site - STRUCTURAL | 7/16/2019 | | 7/19/2019 | | PASS |
Joe Bruce
|
|
|
AHJ
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/19/2019 | | DONE |
|
|
|
ALL MET
need-
Revised cert of value
ACHD
met RP
|
Routing Off Site - STRUCTURAL | 7/9/2019 | | 7/15/2019 | | CANC |
Joe Bruce
|
|
|
AHJ - Corrections required.
|
Plan resubmittals requested | | | 7/15/2019 | | DONE |
Joe Bruce
|
|
|
Emailed archtitect comments from structural engineer.
|
Plan resubmittals received | | | 7/15/2019 | | DONE |
Joe Bruce
|
|
|
Received revised structural drawing from Architect.
|
Plan resubmittals received | | | 7/9/2019 | | DONE |
Joe Bruce
|
|
|
Received structural plans and calculations from applicant.
|
Routing Off Site - STRUCTURAL | 6/21/2019 | | 7/2/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 7/2/2019 | | DONE |
Joe Bruce
|
|
|
Asked architect to provide addtional information for structural plan review in a resubmittal. **JHB**
|
Routing - FIRE | 6/21/2019 | 6/21/2019 | 7/1/2019 | | PASS |
Mark Scharfen
|
|
|
Completed fire review. uploaded rev_fire 07.01.2019.pdf.
|
Plan Reviewer's activity | | | 6/27/2019 | | DONE |
Joe Bruce
|
|
|
Spoke with architect in regards to missing structural information for resubmittal. Waiting for Jon C. to email revised structural calculations.
|
Routing - PLAN CHECK | 6/21/2019 | | 6/27/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing - Design Review | 6/21/2019 | | 6/21/2019 | | PASS |
Josh Wilson
|
|
|
|
Plan resubmittals received | | | 6/19/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 5/15/2019 | 5/18/2019 | 5/16/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/15/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 4/4/2019 | | 5/15/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing - FIRE | 4/4/2019 | 4/4/2019 | 5/14/2019 | | FAIL |
Mark Scharfen
|
|
|
05.14.2019-Completed IFC review. Uploaded rev_fire 05.14.2019.pdf and emailed architect.
|
Routing Off Site - STRUCTURAL | 4/4/2019 | | 4/17/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ
|
Routing PW Sewer Design | 4/8/2019 | | 4/11/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - MECHANICAL | 4/4/2019 | | 4/11/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 4/4/2019 | | 4/9/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 4/4/2019 | | 4/8/2019 | | PASS |
David Moser
|
|
|
See DRH18-00545
|
Routing - PUBLIC WORKS | 4/4/2019 | | 4/8/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Drainage | 4/8/2019 | | 4/8/2019 | | PASS |
Brian Murphy
|
|
|
NO REVIEW REQUIRED
|
Routing PW Street Lights | 4/8/2019 | | 4/8/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 4/8/2019 | | 4/8/2019 | | PASS |
Evan Carpenter
|
|
|
No changes are proposed to solid waste.
|
Routing - Addressing | 4/4/2019 | | 4/5/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - Design Review | 4/4/2019 | | 4/5/2019 | | FAIL |
Josh Wilson
|
|
|
Addition does not match approved Design Review DRH18-00545
|
Routing - Erosion and Sediment | 4/4/2019 | | 4/4/2019 | | PASS |
Michael Zawacki
|
|
|
Waiver approved
|
Intake Approval | | | 4/4/2019 | | PASS |
Julie Romig
|
|
|
Prescreen approved 4/4/19 by JAR
|
Intake Approval | | | 3/21/2019 | | FAIL |
Julie Romig
|
|
|
Need: 1. Completed Form 310 for special inspections (required per S0.01). Form to be signed by owner and completed by structural engineer with engineer's stamp/seal on cover page.
2. ESC Waiver request letter or ESC narrative and plans. Contact Andy Long at along@cityofboise.org or ###-#### with questions.
3. Stamped/Signed landscape plans with "NOT FOR CONSTRUCTION" removed from plans.
|
Application received | | | 3/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 19 2019 4:42PM
|