Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD19-00870
StatusIssued
Name RR BUILDING SPECIALTIES LLC
Site Address 2393 W AIRPORT WAY
Project NameWildland Firefighter TI
Customer Number 
ePlanReviewYes
Description
(WILDLAND FIREFIGHTER FOUNDATION) **This building shall be fully fire sprinklered under this permit. ** Demo permit: BLD18-00618 - Permit for an addition and renovation of an existing rental car facility and change of use to an exhibition hall and office. Work to include construction of exterior site work, new exterior finishes, new monument tower building addition, new stairway to mezzanine, new interior nonbearing partition walls, new doors and millwork, plumbing, electrical, and mechanical work and interior finishes in compliance with Ch. 8 of the 2015 IBC. All work to be done per the approved plans and applicable codes and ordinances. SPECIAL INSPECTIONS are required per form #310 for structural steel welding, masonry, wood, and soils noted on sheet S0.01. This building will be fully Fire Sprinklered and will require a separate permit for the design and installation of the automatic fire sprinkler system. The fire sprinklers shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance6/12/20206/15/20206/15/2020PPASS
DetailsJim Storey
screened // Gabe Phone #: ###-####
BLD-Conference6/9/20206/10/20206/10/2020APASS
DetailsJim Storey
Gabe Phone #: ###-#### insulation ok
BLD-Framing/Rough-in6/5/20206/8/20206/8/2020APASS
DetailsJim Storey
GABE Phone #: ###-####
BLD-Conference5/4/20205/6/20205/6/2020APASS
DetailsJim Storey
Screened- inspection for 12:30 Gabe Phone #: ###-#### exterior sheer nail ok// stair review ok// plate plan to be submitted to joe to delete wall protection west side.
BLD-Aging Inspection4/22/20204/22/20204/22/2020 PASS
DetailsJim Storey
wip
BLD-Foundation12/9/201912/10/201912/10/2019APASS
DetailsJim Storey
call for gate code // Gabe Phone #: ###-####
BLD-Foundation12/2/201912/2/201912/2/2019PPASS
DetailsJim Storey
Gabe Phone #: ###-#### si compaction report pending
Print Occupancy Form  8/19/2019 DONE
Issue PAID IN FULL permit  8/19/2019 DONE
Expiration Notice8/2/20198/23/20198/2/2019 DONE
DetailsBrittany Hill
OVERRIDE  7/19/2019  
Plan assigned to (JHB)4/4/20194/4/20197/19/2019 PASS
DetailsJoe Bruce
07/22 (3rd Rev) 05/15 - 502 Wildan Firefighter Memorial
Routing Off Site - STRUCTURAL7/16/2019 7/19/2019 PASS
DetailsJoe Bruce
AHJ
PLANS/APPL TAKEN TO FRONT DESK  7/19/2019 DONE
Permit Ready to Issue  7/19/2019 DONE
ALL MET
need-
Revised cert of value
ACHD
met RP
Routing Off Site - STRUCTURAL7/9/2019 7/15/2019 CANC
DetailsJoe Bruce
AHJ - Corrections required.
Plan resubmittals requested  7/15/2019 DONE
DetailsJoe Bruce
Emailed archtitect comments from structural engineer.
Plan resubmittals received  7/15/2019 DONE
DetailsJoe Bruce
Received revised structural drawing from Architect.
Plan resubmittals received  7/9/2019 DONE
DetailsJoe Bruce
Received structural plans and calculations from applicant.
Routing Off Site - STRUCTURAL6/21/2019 7/2/2019 FAIL
DetailsJoe Bruce
Plan resubmittals requested  7/2/2019 DONE
DetailsJoe Bruce
Asked architect to provide addtional information for structural plan review in a resubmittal. **JHB**
Routing - FIRE6/21/20196/21/20197/1/2019 PASS
DetailsMark Scharfen
Completed fire review. uploaded rev_fire 07.01.2019.pdf.
Plan Reviewer's activity  6/27/2019 DONE
DetailsJoe Bruce
Spoke with architect in regards to missing structural information for resubmittal. Waiting for Jon C. to email revised structural calculations.
Routing - PLAN CHECK6/21/2019 6/27/2019 PASS
DetailsJoe Bruce
Routing - Design Review6/21/2019 6/21/2019 PASS
DetailsJosh Wilson
Plan resubmittals received  6/19/2019 DONE
DetailsJoe Bruce
Route to Impact Fee Review5/15/20195/18/20195/16/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  5/15/2019 FAIL
DetailsJoe Bruce
Routing - PLAN CHECK4/4/2019 5/15/2019 FAIL
DetailsJoe Bruce
Routing - FIRE4/4/20194/4/20195/14/2019 FAIL
DetailsMark Scharfen
05.14.2019-Completed IFC review. Uploaded rev_fire 05.14.2019.pdf and emailed architect.
Routing Off Site - STRUCTURAL4/4/2019 4/17/2019 FAIL
DetailsJoe Bruce
AHJ
Routing PW Sewer Design4/8/2019 4/11/2019 PASS
DetailsDeAnn Brown
Routing - MECHANICAL4/4/2019 4/11/2019 PASS
DetailsTroy James
Routing - PLUMBING4/4/2019 4/9/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING4/4/2019 4/8/2019 PASS
DetailsDavid Moser
See DRH18-00545
Routing - PUBLIC WORKS4/4/2019 4/8/2019 PASS
DetailsMorgan Webb
Routing PW Drainage4/8/2019 4/8/2019 PASS
DetailsBrian Murphy
NO REVIEW REQUIRED
Routing PW Street Lights4/8/2019 4/8/2019 PASS
DetailsTom Marshall
Routing PW Solid Waste4/8/2019 4/8/2019 PASS
DetailsEvan Carpenter
No changes are proposed to solid waste.
Routing - Addressing4/4/2019 4/5/2019 PASS
DetailsDoug Chausow
Routing - Design Review4/4/2019 4/5/2019 FAIL
DetailsJosh Wilson
Addition does not match approved Design Review DRH18-00545
Routing - Erosion and Sediment4/4/2019 4/4/2019 PASS
DetailsMichael Zawacki
Waiver approved
Intake Approval  4/4/2019 PASS
DetailsJulie Romig
Prescreen approved 4/4/19 by JAR
Intake Approval  3/21/2019 FAIL
DetailsJulie Romig
Need: 1. Completed Form 310 for special inspections (required per S0.01). Form to be signed by owner and completed by structural engineer with engineer's stamp/seal on cover page.
2. ESC Waiver request letter or ESC narrative and plans. Contact Andy Long at along@cityofboise.org or ###-#### with questions.
3. Stamped/Signed landscape plans with "NOT FOR CONSTRUCTION" removed from plans.
Application received  3/19/2019 DONE
Application submitted via PDS Online on Mar 19 2019 4:42PM