Letter of compliance/Occupancy | | | 11/7/2019 | | DONE |
|
|
|
|
First Notice | 11/6/2019 | 11/6/2019 | 11/6/2019 | | DONE |
Brandon Shaw
|
|
|
This permit finaled on the web by Brian McCoy
|
BLD-Final | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PASS |
Brandon Shaw
|
|
|
Tom Phone #: ###-####
|
DOC - Permit Finaled | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 11/5/2019 | 11/5/2019 | 11/5/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signature provided for associated trades on sign off card.
Tom Phone #: ###-####
|
FIRE-Final Inspection | 10/28/2019 | 10/30/2019 | 10/30/2019 | A | FAIL |
Jim Page
|
|
|
FIR permit for fire alarms needs to be finaled before life fire safety inspection can be completed. Notated city approved drawings where plans show exit lights but exit lights are not installed. Notated city approved drawings where a fire extinguisher is shown but is not in place.
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Tom Phone #: ###-####
|
BLD-Final | 8/20/2019 | 8/22/2019 | 8/22/2019 | P | PART |
Brandon Shaw
|
|
|
Phase 1 complete...
|
FIRE-Final Inspection | 8/19/2019 | 8/22/2019 | 8/22/2019 | A | PART |
Jim Page
|
|
|
Fire alarm inspection for phase 1 complete, fire sprinkler inspection for phase 1 is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for phase 1 complete.
Tom Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/3/2019 | 7/8/2019 | 7/8/2019 | A | PASS |
Brandon Shaw
|
|
|
Reception area soffit...
|
BLD-Framing/Rough-in | 6/27/2019 | 6/28/2019 | 6/28/2019 | P | PART |
Tony Young
|
|
|
Tom Phone #: ###-####,, walls ok,, brace per plan
|
Issue PAID IN FULL permit | | | 4/26/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/26/2019 | | DONE |
|
|
|
|
1st review completed | | | 3/27/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 3/27/2019 | | DONE |
|
|
|
all met-Need
GC Form
Revised Value
emailed Shy the fees due
|
Plan assigned to (M_H) | 3/25/2019 | | 3/27/2019 | | DONE |
Michael Hanson
|
|
|
03/28 #518 L1 ePlan
|
Routing - PLAN CHECK | 3/25/2019 | | 3/27/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | 3/25/2019 | | 3/25/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Intake Approval | | | 3/22/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 3/21/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide the following information to have the Prescreen Approved;
1. Sheet A1.0 appears to have a layer or layers not showing. Please update.
2. Verify Portable Fire extinguishers are shown on A1.0
|
Application received | | | 3/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 19 2019 4:59PM
|