Permit Information
Permit NumberBLD19-00885
StatusFinaled
Name SYRINGA CONSTRUCTION OF IDAHO LLC
Site Address 1235 E HIGHLAND VIEW DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3076 sq. ft., two story (first story 1019 sq. ft., second story 2057 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 680 sq. ft. of covered patio/porch and a 1110 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. A-1 zoning and setbacks per planning. ***RDP*** SPRINKLERS NOT REQUIRED. LGM
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/3/20201/7/20201/7/2020ADONE
DetailsTony Young
Garage Code: 0713 Phone #: ###-#### Inspection requested via web by Steve Hanson
DOC - Permit Finaled1/7/20201/7/20201/7/2020PPASS
DetailsTony Young
c of o issued
BLD-Final1/6/20201/6/20201/6/2020PPASS
DetailsTony Young
Need a final inspection, should just need foothills approval letter from Melissa.
Garage code: 0713
Thanks! Phone #: ###-#### Inspection requested via web by Steve Hanson
PubWorks Occupancy Approval1/6/20201/6/20201/6/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Final1/3/20201/3/20201/3/2020PPEND
DetailsTony Young
Garage Code: 0713 Phone #: ###-#### Inspection requested via web by Steve Hanson
BLD-Final1/2/20201/3/20201/3/2020ANR
DetailsTony Young
Garage Code: 0713 Phone #: ###-#### Inspection requested via web by Steve Hanson
BLD-Blower Door Test Results1/2/20201/3/20201/3/2020ADONE
DetailsTony Young
Garage Code: 0713 Phone #: ###-#### Inspection requested via web by Steve Hanson.. 4.2
BLD-Final12/31/20191/2/20201/2/2020ANR
DetailsTony Young
Garage Code: 0713 Phone #: ###-#### Inspection requested via web by Steve Hanson// needs hillside public works final 1st
BLD-Wall cover9/5/20199/6/20199/6/2019APASS
DetailsTony Young
Need a sheetrock sheer inspection please.

Thank you Phone #: ###-#### Inspection requested via web by Steve Hanson
BLD-Other9/3/20199/4/20199/4/2019PPASS
DetailsTony Young
Need soffit inspection for WUI code compliance.

Thank you! Phone #: ###-#### Inspection requested via web by Steve Hanson
BLD-Other8/29/20198/30/20198/30/2019APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Steve Hanson,, need to look at truss engineering// add bracing per engineering,, soffit work in progress,, fire block ceiling line under stairs at fur down,, ok to cover after
BLD-Energy code compliance8/28/20198/29/20198/29/2019PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Steve Hanson
BLD-Framing/Rough-in8/27/20198/29/20198/29/2019PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Steve Hanson
BLD-Framing/Rough-in8/23/20198/27/20198/27/2019APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Steve Hanson,, need truss engineering,, ok to insulate
BLD-Wall Bracing8/13/20198/13/20198/13/2019PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Steve Hanson,,, exterior ok
BLD-Foundation6/26/20196/26/20196/26/2019PPART
DetailsTony Young
Phone #: 2088708888 >> Inspection requested via mobile web by Wes,, retaining and basement and main walls ok,, work in progress
BLD-Footing6/20/20196/21/20196/21/2019PPASS
DetailsTony Young
As early as possible Phone #: 2088708888 >> Inspection requested via mobile web by Wes
PubWorks Subgrade Approval6/13/20196/13/20196/13/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  6/3/2019 DONE
Inspection Record Card- Bld  5/29/2019 DONE
Telephone call  5/29/2019 DONE
left a message for kim informing her that this permit is ready and the fee amount due for issuance
OVERRIDE  5/28/2019  
Plan assigned to (RDP)4/3/20194/3/20195/28/2019 DONE
DetailsRob Patrick
04/08 sfd L2 Paper...04/04 Failed. 04/22...Failed; Fire Flow, Grading/Drainage.
Routing - PLAN CHECK5/28/2019 5/28/2019 PASS
DetailsRob Patrick
Case Summary (BLD)  5/28/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  5/28/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  5/28/2019 DONE
met
Routing - PLANNING5/22/2019 5/23/2019 PASS
DetailsKarla Nelson
Revised plans submitted on 5-3-19 are ok.
Routing PW Grading-Hillside5/22/2019 5/22/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Routing - PUBLIC WORKS5/22/2019 5/22/2019 PASS
DetailsAngela Hardy
Plan Reviewer's activity  5/6/2019  
Delivered resubmittal to Melissa for review
Plan resubmittals received  5/3/2019 DONE
three copies of sheets L-1.1 taken to Rob
Routing - FIRE4/22/20194/22/20195/2/2019 PASS
DetailsLee G Meredith
05/06-Syringa Highland View Home LM Resubmittal

Revised SUEZ document indicates adequate fire flow.
Telephone call  5/2/2019 DONE
left a message for steve informing him i can not give the plan sheet turned in on 4-30 until we have the second copy
Telephone call  5/2/2019 DONE
left a message for kim (steve no longer with the company) informing we need a second copy for resubmittal
Telephone call  4/30/2019 DONE
Left a message for Steve in forming when need a second copy for the plan. asked the person who was here and they stated yes. should have looked before they left
Routing - PLAN CHECK4/22/2019 4/22/2019 FAIL
DetailsRob Patrick
04/22...Failed; Fire Flow, Grading/Drainage, H.E.R.S. rating.
Routing PW Grading-Hillside4/18/2019 4/18/2019 FAIL
DetailsMelissa Jannusch
see e-mail
Plan Reviewer's activity  4/11/2019  
Set entire package on Melissa's desk for her review.
Plan resubmittals received  4/10/2019 DONE
Resubmittal. page. Every sheet has new title block. Resubmitted Sheets 4, 7, 9 and 10.
Routing - PLAN CHECK4/3/2019 4/4/2019 FAIL
DetailsRob Patrick
Corrections Rreq'd
1st review completed  4/4/2019 FAIL
DetailsRob Patrick
Plan assigned to (BJM)3/20/20193/20/20194/3/2019 DEFR
DetailsBrian McGowan
04/08 (L2 sfd) ePlan
Routing - FIRE4/2/2019 4/3/2019 FAIL
DetailsLee G Meredith
04/10 Syringa Highland View Home 402

4-3-19 Hydrant fire flow is inadequate for fire area. Emailed applicant comments and details.
Routing - Erosion and Sediment3/28/2019 4/1/2019 PASS
DetailsAndy J. Long
ESC plan approved. Certified stormwater team. ESC site preparation inspection is required.
Routing - MECHANICAL  3/28/2019 PASS
DetailsTroy James
Routing - PLANNING  3/27/2019 FAIL
The driveway can be no more than 33' in the front setback. Rock walls can be no more than 3' in the front setback and no more than 6' in other setback areas.
Routing - PUBLIC WORKS  3/27/2019 FAIL
Plan resubmittals received  3/27/2019 DONE
Resubmittal received 3 sets of materials testing & insp and 3 sets of sheet grading plan-took to Brian McGowan
Plan Reviewer's activity  3/27/2019  
DetailsBrian McGowan
Took (3) copies of Sheet L-1.1 to Melissa's office
Routing PW Grading-Hillside3/22/2019 3/26/2019 FAIL
DetailsMelissa Jannusch
Needs updated grading plans and conclusion letter
Routing - Addressing3/20/2019 3/22/2019 PASS
DetailsDoug Chausow
Route to Impact Fee Review3/20/20193/23/20193/21/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Plans ACCEPTED BY PLAN TECH  3/20/2019 DONE
Intake Approval  3/20/2019 PASS
Override - Parcel Holds  3/20/2019  
Recd Pcfee & Taken To Pln CK  3/20/2019 DONE
Application received 3/20/2019